Price | negotiation |
MOQ | 1 set |
Delivery Time | 120 days. |
Brand | HONGE |
Place of Origin | China |
Certification | ISO9001/CE |
Model Number | HYL-QLFZ |
Packaging Details | PE film or naked. |
Payment Terms | L/C, T/T |
Supply Ability | 1 or 2 lines per 120 days. |
Place of Origin | China | Trim width | 2600mm |
Packaging Details | PE film or naked. | Material | Shoddy fiber, polyester fiber, low melt fiber, wool, etc. |
Process | air laying+thermal bonding | Specfcation of fiber | 1.5D-15D*51mm-72mm |
Weight range | 500gsm-5000gsm | Model Number | HYL-QLFZ |
Supply Ability | 1 or 2 lines per 120 days. | Certification | ISO9001/CE |
Brand Name | HONGE | Payment Terms | L/C, T/T |
Price | negotiation | Delivery Time | 120 days. |
Product name | 1000kg/h Nonwoven air laying needle punched waste felt fabric making machine | Minimum Order Quantity | 1 set |
Production capacity | Max. 1000kg/h |
1000kg/h Nonwoven air laying needle punched waste felt fabric making machine for sale
Production line description:
This production line designs non-woven manufacturing systems for the automotive industry, airlaid or by carding solution.
The system produce individualized fibers with tensile strength that is uniform in both length and width under controllable percentage.
These
advanced
fiber
web
systems
create
fibers
that
are
ideal
for
automotive
applications
such
as
air
bags,
headliners,
sun
shades,
acoustical
pads,
door
panels,
and
various
engine
parts.
The
versatility
that
is
engineered
into
every
system
allows
for
the
production
of
non-woven
fiber
webs
from
many
materials,
including
cotton,
cotton
shoddy,
synthetic
shoddy,
recycled
fiber,
reclaimed
material.
Technical parameters:
Working width | 2600mm |
Weight range |
500gsm-5000gsm |
Raw material |
1.5D-15D*38mm-51mm shoddy fiber,polyester fiber, low melt fiber, wool, etc. |
Process technology | Airlaid+Thermal bonding process |
Production capacity | max. 1000kg/h |
Applications | quilts, mattress, furniture, garments, insulation materials, etc. |
Installed power | Depends. |
Trade information:
Trade terms | FOB, CNF, or CIF |
Lead time | 120 days after deposit. |
Payment terms | 30% advance payment, 70% paid off before delivery. |
Warranty | twelve (12) months after mechanical and electrical commissioning. |
Products and applications for reference:
Our Service:
1. Professional engineers for installation and commissioning at customers' site
2. Long-life for after-sale service
3. Quick reply in 24 hours
4. Spare parts for machines all the time
Installation
The seller is responsible for installation and debugging. The buyer is responsible for the round-trip airplane tickets, accommodation, medical treatment, safety and relative fees. In addition the buyers should assign translator, workers, electrical cable (from machines to control panel and from power to control panel) and tools for installation to cooperate with the work. Installation cost is USD200/Day/engineer and totally installation period is about 35-40days depending on well cooperation of the buyer.
Remarks: The buyer is responsible for the installation and the seller provides on-line support. If the buyer requests for engineer to go for installation. All the expenses including salary, hotels, daily meals and COVID testing during the quarantine period in customer’s country and back to China will be taken by the buyer.