Price | negotiation |
MOQ | 1 set |
Delivery Time | 120 days. |
Brand | HONGE |
Place of Origin | China |
Certification | ISO9001/CE |
Model Number | HYL-QLFZ |
Packaging Details | PE film or naked. |
Payment Terms | L/C, T/T |
Supply Ability | 1 or 2 lines per 120 days. |
Usage | Make the waste fiber to shoddy felt for insulation material or mattress. | Place of Origin | China |
Trim width | 2600mm | Packaging Details | PE film or naked. |
Material | Shoddy fiber, polyester fiber, low melt fiber, wool, etc. | Weight range | 500gsm-5000gsm |
Model Number | HYL-QLFZ | Supply Ability | 1 or 2 lines per 120 days. |
Certification | ISO9001/CE | Brand Name | HONGE |
Payment Terms | L/C, T/T | Thickness | 5mm~150mm |
Price | negotiation | Delivery Time | 120 days. |
Product name | Airlaid+thermal bonding shoddy felt production line | Minimum Order Quantity | 1 set |
Production capacity | Max. 1000kg/h |
2019 New desigh Air laid Nonwoven Equipment airlaying machine for carpet making machine
Production line description:
The airlaid technology is based on a new aerodynamic fiber batt formation system.
In many applications of the nonwoven sector,capable of replacing traditional mechanical processes using carding
Technical parameters:
Working width | 2600mm |
Weight range |
500gsm-5000gsm |
Raw material |
1.5D-15D*38mm-51mm shoddy fiber,polyester fiber, low melt fiber, wool, etc. |
Process technology | Airlaid+Thermal bonding process |
Production capacity | max. 1000kg/h |
Applications | quilts, mattress, furniture, garments, insulation materials, etc. |
Installed power | Depends. |
Trade information:
Trade terms | FOB, CNF, or CIF |
Lead time | 120 days after deposit. |
Payment terms | 30% advance payment, 70% paid off before delivery. |
Warranty | twelve (12) months after mechanical and electrical commissioning. |
After-sale service | The seller is responsible for installation and debugging. The buyer is responsible for the round-trip airplane tickets, accommodation, medical treatment, safety and relative fees. In addition the buyers should assign translator, workers, electrical cable (from machines to control panel and from power to control panel) and tools for installation to cooperate with the work. Installation cost is USD180/Day/engineer and totally installation period is about 30-40 days depending on well cooperation of the buyer. |
Products and applications for reference:
Our Service:
1. Professional engineers for installation and commissioning at customers' site
2. Long-life for after-sale service
3. Quick reply in 24 hours
4. Spare parts for machines all the time