| Price | Negotiable |
| MOQ | Negotiable |
| Delivery Time | 95 days |
| Brand | LANGE |
| Place of Origin | HeBei China |
| Packaging Details | containers |
| Payment Terms | L/C, T/T, D/P, D/A |
| Supply Ability | 18,000 square meter per month |
| Place of Origin | HeBei China | Packaging Details | containers |
| Service Life: | 50 Years | Supply Ability | 18,000 square meter per month |
| Surface Treatment: | Painting Or Hot-dip Galvanize | Application: | Warehouse, Workshop, Factory Building |
| Brand Name | LANGE | Payment Terms | L/C, T/T, D/P, D/A |
| Price | Negotiable | Delivery Time | 95 days |
| Project Solution Capability: | 3D model design, total solution for projects, Others | Material: | carbon structural steel |
| Type: | Large Span Easy Assemble Steel Warehouse |
Compared with buildings that must be designed and built from scratch, prefabricated steel or metal buildings can save a lot of time, energy and money. This can help those with limited budgets or those who are pressed for time and worried about the cost of such undertakings.
| Items | Specifications: |
| Minimum Order Quantity | 50 square meters |
| Price | Negotiable |
| Packaging Details | In bulk |
| Delivery Time | 5-8 work days |
| Payment Terms | T/T, L/C at sight |
| Life time | 100 years for structure |
My company has a large steel structure processing equipment, select high-quality plates, according to the national standards of manufacturing series of products,to meet the needs of the various types of steel structure engineering.