Price | Negotiable |
MOQ | Negotiable |
Delivery Time | 90 days |
Brand | LANGE |
Place of Origin | HeBei China |
Packaging Details | containers |
Payment Terms | L/C, T/T, D/P, D/A |
Supply Ability | 18,000 square meter per month |
Place of Origin | HeBei China | Length: | Customers' Requirements |
Packaging Details | containers | H beam | 4000-15000mm |
Supply Ability | 18,000 square meter per month | Application: | Warehouse, Workshop, Factory Building |
Surface Treatment: | Painted or Galvanized | Brand Name | LANGE |
Payment Terms | L/C, T/T, D/P, D/A | Price | Negotiable |
Delivery Time | 90 days | Size: | Customers' Requirements |
Anti-Fire | High Anti-Fire |
1) Structural design, detail design, computer simulation installation, factory manufacturing, site installation, etc. are carried out synchronously with a small time difference.
2) The dry construction method above the foundation has no wet operation, and the interior decoration is easy to be in place at one time. After galvanizing and coating, the profile has beautiful appearance and anti-corrosion, which is conducive to reducing the cost of enclosure and decoration.
No. | Item | Details of steel structure building or steel frame | |
1 | Material | Material | carbon structural steel |
2 | Produce | Lead time | Normallly 45days after down payment, also according to quantity. |
3 | Quality | Certification | Quality certificate from factory, the third party by client request. |
4 | Dimensions | Length | H beam: 4000-15000mm |
5 | Thickness: | web plate: 6-32mm | |
6 | wing plate: 6-40mm | ||
7 | Height | 200-1200mm | |
8 | Color | According to customers | |
9 | Size | MOQ is 1000 m2, width * length * eave height, |
My company has a large steel structure processing equipment, select high-quality plates, according to the national standards of manufacturing series of products,to meet the needs of the various types of steel structure engineering.