China ODM Stainless Steel Metal Fabrication Flower Pot With 100micron PVC Film for sale
China ODM Stainless Steel Metal Fabrication Flower Pot With 100micron PVC Film for sale
  1. China ODM Stainless Steel Metal Fabrication Flower Pot With 100micron PVC Film for sale

ODM Stainless Steel Metal Fabrication Flower Pot With 100micron PVC Film

Price 11-60 USD
MOQ 1 PCS
Delivery Time 7-15 working days
Brand MBT
Place of Origin CHINA
Certification ISO, AISI, ASTM, GB, EN, DIN, JIS
Model Number 201
Packaging Details Export Wooden Case
Payment Terms L/C, D/A, D/P, T/T
Supply Ability 7000-8000 tons/month

Product Details

Product Specification

Place of Origin CHINA Shape Pot
Packaging Details Export Wooden Case PVC Film 100micron PVC
Grade 201 Dimater 40-80mm
Model Number 201 Supply Ability 7000-8000 tons/month
Certification ISO, AISI, ASTM, GB, EN, DIN, JIS Brand Name MBT
Payment Terms L/C, D/A, D/P, T/T Thickness 0.5-3.0mm
Type Stainless Steel Metal Fabrication Price 11-60 USD
Delivery Time 7-15 working days Minimum Order Quantity 1 PCS
Surface Treatment Mirror Color Coating Rose Cold
Height 40-80mm Technique PVD Coating

Product Description

Antique Stainlss Steel Flower Pot Stainless Steel Metal Fabrication

 
Type Stainless steel Metal Fabrication 
Thickness 0.5-3.0mm
Size Dimater :40-80mm   Height :40-80mm
Grade 201.
Available finishes  Hairline, Mirror, 
Available Color Gold ,Rose gold , Sliver PVD Coating
Origin POSCO,JISCO,TISCO, etc.
Packing way PVC+ waterproof paper + strong sea-worthy wooden package

 

Other Stainless Steel Metal Fabrication Stainlss Steel Flower Pot

FAQ:

WHO IS MEIBAOTAI ?

Meibaotai Stainless Steel Products Co., Ltd.,which is foshan andyson steel manufacture and processing surface,

it's the largest stainless steel products manufacturing and storing base for South China.

 

WHICH REGIONS AND COUNTRIES DO YOU MAINLY EXPORT TO?

we have exported to over 30 countries, mainly in, Middle East, Asia, Europe.

 

HOW ABOUT YOUR DELIVERY TIME?

7~15 days for spot products and 30~45 days for customized products.

 

WHAT’S THE PAYMENT TERM?

When we quote for you,we will confirm with you the way of transaction,FOB,CIF,CNF,etc. For mass production goods, you need to pay 30% deposit before producing and70% balance against copy of documents.The common way is by T/T. L/C is also acceptable.

 

HOW ABOUT THE CAPACITY OF YOUR COMPANY?
Our production capacity is 7000-8000tons / month.

 

WHAT IS YOUR TERMS OF DELIVERY?
EXW, FOB, CFR, CIF.
Generally, it will take 25 to 30 days after you confirm the elevator (escalator) specification and drawing, and receiving your advance payment.

 

Foshan Meibaotai Stainless Steel Products Co., Ltd.

Manufacturer, Exporter
  • Annual Revenue: 1-30
  • Employees: 86~757 - 23328960
  • Year Established: 2008