 
                                
                                
                             
                             
                                         
                                         
                                         
                                        | Price | factory price | 
| MOQ | 1 | 
| Delivery Time | 30days | 
| Brand | Fuji | 
| Place of Origin | China | 
| Certification | ICP CE | 
| Model Number | FJ-f01 | 
| Packaging Details | sea shipping | 
| Supply Ability | 100Units /month | 
| Floor | Ship deck steel | Capicity | 1-10 Tons | 
| Place of Origin | China | Warranty | 12month | 
| Packaging Details | sea shipping | Model Number | FJ-f01 | 
| Supply Ability | 100Units /month | Certification | ICP CE | 
| Brand Name | Fuji | Lifting Height | 1-8m | 
| Price | factory price | Delivery Time | 30days | 
| Minimum Order Quantity | 1 | weighting system | Choise | 
Fuji 4 Tons Industrial Freight Elevator 3m Vertical Cargo Lift
Why Use This Cargo Lift ?
1. Non-Pit installation. The cargo lift elevator no need extra engine room or big pit, platform directly fixed on the ground, save space.
2. Lower fault rates. Hydraulic driving with simple control system. Much lower fault rates than other complex elevator system.
3. Much more lower cost. Simple control system and simple structure will lower the total service cost. Especially suitable for some low budget project. You can do maintenancework by yourself, no need any professional engineer.
Introduce
This cargo lift elevator droved by the electric and hydraulic system, lifting up and down along the guide rail.
Equipped single side or double sides hydraulic cylinder to keep the machinery works smooth and steady.
Installation & Control
        •
        Installed
        in
        the
        pit
        or
        the
        ground
        floor.
        •
        Control
        panels
        both
        on
        ground
        and
        top
        floor.
      
Standard Configuration
        •
        Use
        high
        strength
        H
        Steel
        materials
        as
        guide
        rail
        structure.
        •
        1
        or
        2
        pcs
        high
        strength
        hydraulic
        cylinder.
        •
        Manual
        down
        valve
        on
        the
        machine..
        •
        Anti-Rust
        and
        Anti-corrosion
        painting.
        •
        Digital
        display
        control
        panels
        on
        every
        floor.
        •
        Emergency
        stop:
        lifting
        and
        lowering
        process
        can
        be
        stopped
        immediately.
      
| No. | Structure | Material name | Material | Specification | 
| 1 | Body materials | Lead rail | manganese steel | 125*125H | 
| 2 | Counter-tops truss | Q235C | 12# channel steel | |
| 3 | Up platform | Q345B | checkered plate 4mm | |
| 4 | Cylinder arm | Q235 | original tablet 9mm | |
| 5 | connecting pin | heat treatment 45# | Round steel 60*48mm | |
| 6 | Chain | |||
| 7 | Oil-lubricated bearings | |||
| 8 | Hydraulic system | Precision Hydraulic Cylinders | ||
| 9 | Sealing elements | |||
| 10 | High pressure piping | |||
| 11 | Supporting valve | |||
| 12 | Electric control | AC contractor | CJX1 | |
| 13 | Limit switches | YBLX-K3-20X/T | ||
| 14 | Micro Switch | |||
| 15 | Electric motor | 3KW | ||
| 16 | Voltage | customized | ||
The company has established a professional special team for installing elevators in old buildings, and can send professional maintenance personnel to the station according to the number of elevators installed in each community, so that they can reach the fault location within 15 minutes; and there will be preliminary coordination work. Professional project engineering supervision personnel timely and effectively deal with various problems arising during the construction process; so that every user who chooses Guangdong Fuji Elevator can get the greatest guarantee!
With a professional after-sales service team, it has led the establishment of the principle of "one call, two hours, and quick response to customer feedback" in the elevator industry, and integrated the active spirit into the full-service service. Only with a real sense of initiative can we serve customers Only by thinking more and doing more can we truly serve our customers well.