Price | 0.5$/m(1~10m);0.43$/m(>1000m) |
MOQ | 10 Meter/Meters |
Delivery Time | Negotiable |
Brand | HAIYANG |
Place of Origin | China |
Certification | ISO9001 |
Model Number | HM06008 |
Packaging Details | 6m or 12m per piece |
Supply Ability | 5000 Metric Ton/Metric Tons per Year |
Usage | Water supply | Place of Origin | China |
Size | Customized Size | Sample | Provide Sample |
Packaging Details | 6m or 12m per piece | Color | Black,white,grey,green or at request |
Specification | DN20-DN800mm | Model Number | HM06008 |
Raw material | PVC | Supply Ability | 5000 Metric Ton/Metric Tons per Year |
Certification | ISO9001 | Brand Name | HAIYANG |
Working pressure | 0.2mpa-2.5mpa | Advantage | High Quality |
Price | 0.5$/m(1~10m);0.43$/m(>1000m) | Length | as costomer requirements |
Minimum Order Quantity | 10 Meter/Meters |
PVC Pipe Fittings DIY Shoe Cabinet Right-Angle Shelf Plastic 1 Inch 20 25 Tube Fitting For Water Supply
----------------------------------------
Basic Info.
There
are
PVC
pipes
with
a
nominal
outer
diameter
of
50CM,
but
the
largest
soft
PVC
pipe
is
generally
50mm.
Rigid
PVC
pipe
has
a
nominal
outer
diameter:
(unit
mm)
2.5,
3,
4,
5,
6,...355,
400,
450,
500,
560,
630,
710,
800,
900,
1000,
etc.
DN.mm | Wall thickness(mm) | |||||
0.63 M pa | 0.8Mpa | l.OMpa | 1.25Mpa | 1.6Mpa | 2.0Mpa | |
20 | - | - | - | - | 2.0 | 2.0 |
25 | - | - | - | - | 2.0 | 2.0 |
32 | - | - | - | - | 2.0 | 2.0 |
40 | - | - | - | - | 2.0 | 2.0 |
50 | - | - | - | - | 2.0 | 2.4 |
50 | - | - | - | 2.0 | 2.4 | 3.0 |
63 | - | - | 2.0 | 2.5 | 3.0 | 3.8 |
75 | - | 2.0 | 2.3 | 2.9 | 3.6 | 4.5 |
90 | 2.0 | 2.2 | 2.8 | 3.5 | 4.3 | 6.5 |
110 | 2.2 | 2.7 | 3.4 | 4.2 | 5.3 | 6.6 |
125 | 2.5 | 3.1 | 3.9 | 4.8 | 6.0 | 7.4 |
140 | 2.8 | 3.5 | 4.3 | 5.4 | 6.7 | 8.3 |
160 | 3.2 | 4.0 | 4.9 | 6.2 | 7.7 | 9.5 |
180 | 3.6 | 4.4 | 5.5 | 6.9 | 8.6 | 10.7 |
200 | 3.9 | 4.9 | 6.2 | 7.7 | 9.6 | 11.9 |
225 | 4.4 | 5.5 | 6.9 | 8.6 | 10.8 | 13.4 |
250 | 4.9 | 6.2 | 7.7 | 9.6 | 11.9 | 14.8 |
280 | 5.5 | 6.9 | 8.6 | 10.7 | 13.4 | 16.6 |
315 | 6.2 | 7.7 | 9.7 | 12.1 | 15.0 | 18.7 |
355 | 7.0 | 8.7 | 10.9 | 13.6 | 16.9 | 21.1 |
400 | 7.9 | 9.8 | 12.3 | 15.3 | 19.1 | 23.7 |
450 | 8.8 | 11.0 | 13.8 | 17.2 | 21.5 | 26.7 |
500 | 8.9 | 12.3 | 15.3 | 19.1 | 23.9 | 29.7 |
560 | 11.0 | 13.7 | 17.2 | 21.4 | 26.7 | 33.2 |
630 | 12.3 | 15.4 | 19.3 | 24.1 | 30.0 | 37.4 |
Advantage
Vicat
softening:
temperature≥74℃
Oven
test:
the
sample
has
no
blistering,
chipping
and
cracking
of
the
joints;
defects
around
the
injection
point
that
do
not
penetrate
50%
of
the
wall
thickness
of
the
point
are
allowed;
cracks
that
are
not
used
to
the
full
wall
thickness
are
allowed
at
the
joint
line
Drop
test
Appearance:
No
cracks,
the
inner
and
outer
surfaces
of
the
pipe
fittings
are
smooth
and
flat,
no
bubbles,
cracks
and
obvious
marks,
depressions,
uneven
color
and
discoloration
lines
are
allowed.
The
pipe
fittings
should
be
intact
and
free
of
defects,
and
the
gate
and
overflow
should
be
trimmed
and
smooth.
Details
Application
Pipeline
foundation
laying
(1)
To
ensure
that
the
bottom
of
the
pipe
is
in
close
contact
with
the
foundation
and
to
control
the
axis
elevation
and
slope
of
the
pipe,
the
PVC-U
pipe
should
still
be
used
as
a
cushion
foundation.
For
general
soil,
only
a
layer
of
0.1m
thick
sand
cushion
is
usually
enough.
For
soft
soil
foundation,
and
when
the
bottom
of
the
trough
is
below
the
groundwater
level,
it
is
advisable
to
spread
a
layer
of
gravel
or
gravel
with
a
thickness
of
not
less
than
0.15m
and
a
gravel
particle
size
of
5-40mm,
and
then
pave
a
layer
of
gravel
or
gravel
with
a
thickness
of
not
less
than
0.05m.
Sand
cushion
to
facilitate
the
stability
of
the
foundation.
The
foundation
should
leave
a
groove
at
the
socket
connection
part
to
facilitate
the
placement
of
the
socket,
and
then
backfill
it
with
sand
after
installation.
The
axillary
corners
where
the
bottom
of
the
pipe
meets
the
foundation
must
be
filled
with
coarse
sand
or
medium
sand
to
tightly
wrap
the
part
of
the
bottom
of
the
pipe
to
form
an
effective
support.
(2)
Generally,
manual
installation
is
adopted
for
pipeline
installation.
For
pipes
with
groove
depth
greater
than
3m
or
pipe
diameter
greater
than
DN400mm,
non-metallic
ropes
can
be
used
to
hoist
pipes
into
the
groove.
When
installing
the
socket
pipe,
the
socket
should
be
installed
in
the
direction
of
water
flow,
and
the
socket
should
be
installed
in
sequence
from
downstream
to
upstream.
The
length
of
the
pipe
can
be
cut
with
a
hand
saw,
but
the
section
should
be
kept
vertical
and
flat
without
damage.
The
installation
of
the
small-caliber
pipe
can
be
done
manually.
A
wooden
baffle
is
installed
at
the
end
of
the
pipe
and
a
crowbar
is
used
to
align
the
installed
pipe
with
the
axis
and
insert
it
into
the
socket.
Pipes
with
a
diameter
greater
than
DN400mm
can
be
used
to
carry
hoists
and
other
tools
by
hand,
but
construction
machinery
must
not
be
used
to
force
the
pipe
into
place.
Most
of
the
pipe
interfaces
are
rubber
ring
interfaces,
which
are
easy
to
operate,
but
attention
should
be
paid
to
the
section
type
and
sealing
effect
of
the
rubber
ring.
The
sealing
effect
of
the
round
rubber
ring
is
not
good,
and
the
sealing
effect
of
the
special-shaped
rubber
ring
with
low
deformation
resistance
and
preventing
rolling
is
better.
Ordinary
bonding
interface
is
only
suitable
for
pipes
below
DN110mm.
Ribbed
winding
pipes
must
use
special
pipe
joints
and
adhesives
made
by
the
manufacturer
to
ensure
the
quality
of
the
joints.
(3)
The
connection
between
the
pipeline
and
the
inspection
well
should
adopt
a
flexible
interface,
and
can
be
connected
by
socket
pipe
fittings.
It
can
also
be
connected
with
a
precast
concrete
sleeve,
the
concrete
sleeve
is
laid
in
the
wall
of
the
inspection
well,
and
the
inner
wall
of
the
sleeve
and
the
pipe
are
sealed
with
a
rubber
ring
to
form
a
flexible
connection.
The
bonding
performance
of
cement
mortar
and
PVC-U
is
not
good,
so
it
is
not
advisable
to
directly
build
pipes
or
fittings
in
the
inspection
shaft
wall.
Intermediate
layer
can
be
used,
that
is,
a
layer
of
plastic
adhesive
is
evenly
coated
on
the
outer
surface
of
the
PVC-U
pipe,
and
then
a
layer
of
dry
coarse
sand
is
sprinkled
on
it.
After
curing
for
20
minutes,
an
intermediate
layer
with
a
rough
surface
will
be
formed.
The
well
can
ensure
a
good
combination
with
cement
mortar.
In
pit
ponds
and
soft
soil
zones,
in
order
to
reduce
uneven
settlement
of
pipelines
and
inspection
wells,
an
effective
method
is
to
first
connect
a
short
pipe
of
no
more
than
2m
to
the
inspection
well,
and
then
connect
the
entire
length
of
the
pipe
below.
,
So
that
the
settlement
difference
between
the
inspection
well
and
the
pipeline
forms
a
smooth
transition.
(4)
The
trench
backfilling
flexible
pipe
works
as
the
pipe
and
soil
to
bear
the
load.
The
trench
backfill
material
and
the
compactness
of
the
backfill
have
a
great
influence
on
the
deformation
and
bearing
capacity
of
the
pipeline.
The
greater
the
deformation
modulus
of
the
backfill
and
the
higher
the
degree
of
compaction,
the
smaller
the
deformation
of
the
pipeline
and
the
greater
the
bearing
capacity.
The
design
and
construction
should
be
carefully
considered
according
to
specific
conditions.
In
addition
to
the
general
regulations
of
pipeline
engineering,
the
trench
backfilling
must
also
take
corresponding
necessary
measures
based
on
the
characteristics
of
the
PVC-U
pipe.
The
pipeline
should
be
backfilled
immediately
after
installation,
and
it
is
not
advisable
to
stop
for
a
long
time
before
backfilling.
The
backfill
material
within
0.4m
from
the
bottom
of
the
tube
to
the
top
of
the
tube
must
be
strictly
controlled.
Crushed
stone
chips,
gravel,
medium
sand
and
coarse
sand
or
excavated
good-quality
soil
can
be
used.
When
the
pipeline
is
located
under
the
carriageway
and
the
pavement
is
built
immediately
after
laying,
the
impact
of
the
trench
backfill
settlement
on
the
pavement
structure
should
be
considered.
The
range
of
0.4m
from
the
bottom
of
the
pipe
to
the
top
of
the
pipe
must
be
backfilled
and
compacted
with
medium,
coarse
sand
or
stone
chips
in
layers.
In
order
to
ensure
the
safety
of
the
pipeline,
the
tamping
machine
shall
not
be
tamped
within
0.4m
above
the
top
of
the
pipe.
The
compaction
coefficient
of
backfilling
from
the
bottom
of
the
pipe
to
the
top
of
the
pipe
should
be
greater
than
or
equal
to
95%;
for
the
range
0.4m
above
the
pipe
top,
it
should
be
greater
than
80%;
other
parts
should
be
greater
than
or
equal
to
90%.
In
rainy
season
construction
should
also
pay
attention
to
prevent
water
accumulation
in
the
trench.
The
pipeline
floats.
(5)
The
tightness
test
after
installation
of
the
pipeline
can
adopt
closed
water
test
or
closed
air
test.
The
air-tight
test
is
simple
and
fast,
which
is
most
suitable
for
the
characteristics
of
PVC-U
pipeline
construction
speed.
However,
there
are
no
inspection
standards
and
special
inspection
equipment
at
present,
and
further
research
is
needed.
The
tightness
of
PVC-U
pipes
is
better
than
that
of
concrete
pipes,
and
a
good
rubber
ring
joint
can
be
completely
waterproof.
Because
the
allowable
water
leakage
for
the
closed
water
test
of
PVC-U
pipes
is
stricter
than
that
for
concrete
pipes,
my
country
has
no
specific
regulations.
The
United
States
stipulates
that
the
leakage
per
km
of
pipe
length
for
24
hours
should
not
exceed
4.6
liters
per
mm
pipe
diameter.
Use
for
reference.
Certificate
Company Profile
High Mountain Pipe is a well-known PVC pipe manufacturer and wholesaler in Jiangsu. It produces multi-caliber HDPE pipes, pvc pipes, pvc hoses and accessories and supporting machines. The products are widely used. It is the first choice for watering and irrigation of agricultural and forestry breeding gardens. The pipeline is An essential transmission tool for industrial, agricultural, and construction engineering drainage cleaning. Complete specifications, can be customized according to customer needs, use quality to create a brand, and use service to win trust.
The company adheres to the people-oriented scientific development concept, correctly grasps product development trends, implements strategic target management, is committed to developing core manufacturing advantages, optimizing resource allocation and technological breakthroughs, introducing market-oriented and refined operating systems, achieving leapfrog development, and striving to build " "Rongchengxing" brand, implement a win-win strategy, and work hard for the development of the industry!
FAQ
Q:
What
is
the
purpose
of
this
pipeline?
A:
It
is
mainly
used
to
transport
liquids,
and
is
used
on
a
large
scale
in
urban
water
supply
projects,
farmland
irrigation,
etc.
Q:
What
certificates
do
you
have
for
this
product?
A:
ISO,
CE,
SGS,
etc.
Q:
Is
the
price
on
this
page
correct?
A:
The
listed
prices
are
for
reference
only,
please
contact
us
directly
for
the
latest
prices.