Price | 0.5$/m(1~10m);0.43$/m(>1000m) |
MOQ | 10 Meter/Meters |
Delivery Time | Negotiable |
Brand | HAIYANG |
Place of Origin | China |
Certification | ISO9001 |
Model Number | HM05017 |
Packaging Details | 6m or 12m per piece |
Supply Ability | 5000 Metric Ton/Metric Tons per Year |
Usage | water supply | Place of Origin | China |
Size | Customized Size | Sample | Provide Sample |
Packaging Details | 6m or 12m per piece | Color | Grey,white,black or request |
Specification | DN20mm-630mm | Model Number | HM05017 |
Raw material | PVC | Supply Ability | 5000 Metric Ton/Metric Tons per Year |
Certification | ISO9001 | MOQ | 100 Meters |
Brand Name | HAIYANG | Advantage | High Quality |
Price | 0.5$/m(1~10m);0.43$/m(>1000m) | Length | as costomer requirements |
Minimum Order Quantity | 10 Meter/Meters |
PVC Pipe Upvc Water Supply And Drainage Pipe 25 Tap Water Plastic Hard Pipe 20 1 Inch White 32 63mm
----------------------------------------
Basic Info.
PVC
water
supply
pipe
is
made
of
sanitary
polyvinyl
chloride
resin
as
the
main
raw
material,
added
with
quantitative
stabilizers,
lubricants,
fillers,
colorants,
etc.,
is
extruded
by
a
plastic
extruder
and
injection
molded
by
an
injection
molding
machine,
and
is
cooled,
solidified,
A
water-supply
pipe
produced
by
processes
such
as
shaping,
inspection,
and
packaging.
Polyvinyl
chloride
resin
as
the
main
raw
material
Specifications:
Φ20,
Φ25,
Φ32,
etc.
Main
features:
light
weight,
excellent
corrosion
resistance,
etc.
Application
scope:
transportation
of
drinking
water,
mud,
chemicals,
indoor
water
supply,
water
supply
and
drainage,
etc.
Nominal Outside Diameter | Dimensions(mm) | |||||||||||||
S20/SDR41 | T | S16/SDR33 | T | S12.5/SDR26 | T | S10/SDR21 | T | S8/SDR17 | T | S6.3/SDR13.6 | T | S5/SDR11 | T | |
16 | 2.0 | 0.4 | ||||||||||||
20 | 2.0 | 0.4 | ||||||||||||
25 | - | 2.0 | 0.4 | 2.3 | 0.5 | |||||||||
32 | 2.0 | 0.4 | 2.4 | 0.5 | 2.9 | 0.5 | ||||||||
40 | - | - | 2.0 | 0.4 | 2.4 | 0.5 | 3.0 | 0.5 | 3.7 | 0.6 | ||||
50 | - | 2.0 | 0.4 | 2.4 | 0.5 | 3.0 | 0.5 | 3.7 | 0.6 | 4.6 | 0.7 | |||
63 | 2.0 | 0.4 | 2.5 | 0.5 | 3.0 | 0.5 | 3.8 | 0.6 | 4.7 | 0.7 | 5.8 | 0.8 | ||
75 | 2.3 | 0.5 | 2.9 | 0.5 | 3.6 | 0.6 | 4.5 | 0.7 | 5.6 | 0.8 | 6.8 | 0.9 | ||
90 | 2.8 | 0.5 | 3.5 | 0.6 | 4.3 | 0.7 | 5.4 | 0.8 | 6.7 | 0.9 | 8.2 | 1.1 | ||
110 | 3.4 | 0.6 | 4.2 | 0.7 | 5.3 | 0.8 | 6.6 | 0.9 | 8.1 | 1.1 | 10.0 | 1.2 | ||
125 | 3.9 | 0.6 | 4.8 | 0.7 | 6.0 | 0.8 | 7.4 | 1.0 | 9.2 | 1.2 | 11.4 | 1.4 | ||
140 | 4.3 | 0.7 | 5.4 | 0.8 | 6.7 | 0.9 | 8.3 | 1.1 | 10.3 | 1.3 | 12.7 | 1.5 | ||
160 | 4.0 | 0.6 | 4.9 | 0.7 | 6.2 | 0.9 | 7.7 | 1.0 | 9.5 | 1.2 | 11.8 | 1.4 | 14.6 | 1.7 |
180 | 4.4 | 0.7 | 5.5 | 0.8 | 6.9 | 0.9 | 8.6 | 1.1 | 10.7 | 1.3 | 13.3 | 1.6 | 16.4 | 1.9 |
200 | 4.9 | 0.7 | 6.2 | 0.9 | 7.7 | 1.0 | 9.6 | 1.2 | 11.9 | 1.4 | 14.7 | 1.7 | 18.2 | 2.1 |
225 | 5.5 | 0.8 | 6.9 | 0.9 | 8.6 | 1.1 | 10.8 | 1.3 | 13.4 | 1.6 | 16.6 | 1.9 | - | |
250 | 6.2 | 0.9 | 7.7 | 1.0 | 9.6 | 1.2 | 11.9 | 1.4 | 14.8 | 1.7 | 18.4 | 2.1 | - | |
280 | 6.9 | 0.9 | 8.6 | 1.1 | 10.7 | 1.3 | 13.4 | 1.6 | 16.6 | 1.9 | 20.6 | 2.3 | - | |
315 | 7.7 | 1.0 | 9.7 | 1.2 | 12.1 | 1.5 | 15.0 | 1.7 | 18.7 | 2.1 | 23.2 | 2.6 | - | |
355 | 8.7 | 1.1 | 10.9 | 1.3 | 13.6 | 1.6 | 16.9 | 1.9 | 21.1 | 2.4 | 26.1 | 2.9 | - | |
400 | 9.8 | 1.2 | 12.3 | 1.5 | 15.3 | 1.8 | 19.1 | 2.2 | 23.7 | 2.6 | 29.4 | 3.2 | - | |
450 | 11.0 | 1.3 | 13.8 | 1.6 | 17.2 | 2.0 | 21.5 | 2.4 | 26.7 | 3.0 | 33.1 | 3.6 | - | |
500 | 12.3 | 1.5 | 15.3 | 1.8 | 19.1 | 2.2 | 23.9 | 2.6 | 29.7 | 3.2 | 36.8 | 3.9 | - | |
560 | 13.7 | 1.6 | 17.2 | 2.0 | 21.4 | 2.4 | 26.7 | 2.9 | - | - | - | - | - | |
630 | 15.4 | 1.8 | 19.3 | 2.2 | 24.1 | 2.7 | 30.0 | 3.2 | - | - | - | - | - | |
710 | 17.4 | 2.0 | 21.8 | 2.4 | 27.2 | 3.0 | ||||||||
800 | 19.6 | 2.2 | 24.5 | 2.7 | 30.6 | 3.3 |
Advantage
1.
It
has
good
tensile
and
compressive
strength:
but
its
flexibility
is
not
as
good
as
other
plastic
pipes.
2.
Low
fluid
resistance:
The
wall
of
PVC-U
pipe
is
very
smooth
and
has
little
resistance
to
fluid.
Its
roughness
coefficient
is
only
0.009.
Its
water
delivery
capacity
is
20%
higher
than
that
of
cast
iron
pipes
of
the
same
pipe
diameter
and
40%
higher
than
that
of
concrete
pipes.
%.
3.
Excellent
corrosion
resistance
and
chemical
resistance:
PVC-U
pipes
have
excellent
acid
resistance,
alkali
resistance,
and
corrosion
resistance,
and
are
not
affected
by
damp
water
and
soil
pH.
No
anti-corrosion
treatment
is
required
when
laying
pipes.
4.
It
has
good
water
tightness:
the
installation
of
PVC-U
pipes,
regardless
of
whether
it
is
connected
by
bonding
or
rubber
ring
connection,
has
good
water
tightness.
5.
Anti-bite:
PVC-U
tube
is
not
a
source
of
nutrition,
so
it
will
not
be
corroded
by
rodents.
According
to
tests
conducted
by
the
National
Health
Foundation
in
Michigan,
rats
will
not
bite
PVC-U
pipes.
Details
Application
1.
Before
the
sub-base
layer
is
constructed
by
the
subgrade
unit,
the
horizontal
and
centrally
divided
drainage
pipe
should
be
buried.
2.
Slotting:
Manual
slotting
is
carried
out
according
to
the
design
of
the
drawings
and
the
design
stake
position
measured
by
the
surveying
personnel.
The
width
of
the
PE
pipe
groove
is
slightly
wider
than
the
pipe
diameter
by
1
to
2
cm,
and
the
groove
depth
is
23
cm
below
the
surface
of
the
road
bed.
Groove
length
It
is
required
that
the
inner
side
is
10
cm
away
from
the
center
line,
the
outer
side
extends
to
the
slope,
and
the
excavation
section
extends
to
the
inner
wall
of
the
side
trench.
The
slope
of
the
groove
should
follow
the
horizontal
drainage
slope
of
the
road,
and
the
slope
must
not
be
reversed
to
ensure
that
the
water
in
the
road
is
drained
out
of
the
roadbed.
Pull
the
cord
to
ensure
it
is
straight
and
smooth.
3.
Take
over:
The
two
ends
of
each
PVC
pipe
must
be
tightened
with
rubber
rings
to
avoid
water
leakage.
4.
Lower
tube:
After
cleaning
the
bottom
of
the
tank
and
connecting
the
tube
according
to
the
length
of
the
tank,
put
the
tube
into
the
tank.
The
end
on
the
side
of
the
central
partition
belt
should
be
tightly
tied
with
a
sack
cloth
to
prevent
debris
from
entering
the
tube
and
causing
blockage.
5.
Backfilling:
Select
the
excavated
fine-grained
soil
to
backfill,
or
use
sand
to
backfill,
the
big
stones
must
be
removed,
and
the
backfill
must
be
manually
tamped.
The
top
surface
of
the
backfill
shall
not
be
higher
than
the
road
bed,
and
it
must
be
1~
2
cm
is
appropriate,
otherwise
it
will
be
crushed
by
the
vehicle
and
unable
to
discharge
water.
6.
Cleaning:
The
remaining
soil
after
backfilling
should
be
removed
immediately,
and
the
road
surface
should
be
cleaned
up.
The
remaining
soil
of
the
PE
pipe
should
be
unloaded
in
designated
places
such
as
borrow
yard,
and
should
not
be
unloaded
on
the
road
at
will.
7.
After
the
construction
of
the
base
layer
of
the
filling
section
is
completed,
on
the
brushed
side
slope,
in
the
outlet
according
to
the
design
size,
cast
the
trapezoidal
outlet
pad,
and
the
pad
shall
be
poured
with
a
shaped
wooden
mold,
and
the
slope
shall
be
flattened
before
pouring.
And
nail
in
3
bamboo
sticks
25
cm
long
for
stability.
Certificate
Company Profile
High Mountain Pipe is a modern emerging enterprise integrating scientific research, development, production and sales. It also sells plumbing equipment from other well-known domestic manufacturers, and its business scope covers various overseas countries and cities.
The company will adhere to the corporate tenet of "survive by quality, develop by service", "abide by contract and respect reputation", and take "integrity, pragmatism, pioneering and enterprising" as its business philosophy to provide you with excellent products and services. Hope to establish long-term friendly cooperative relations with customers from all over the world. Go hand in hand, mutual benefit and create brilliance together.
The company adheres to the belief of "integrity first, mutual benefit, and efficient development", based on the present and focusing on the future. Warmly welcome new and old customers, guests and friends from all walks of life to patronize, consult and guide, work together to create brilliant.
FAQ
Q:
What
is
the
delivery
time?
A:
We
always
have
common
products
in
stock
and
can
be
shipped
within
30
days.
Large
orders
require
15
days
to
complete
production.
Q:
What
is
your
minimum
order
quantity?
A:
Accessories:
one
box
or
one
bag.
Pipeline:
200~5000
meters/size,
depending
on
different
sizes.
Q:
What
are
your
payment
terms?
A:
Accept
the
T/T
and
L/C
terms.