China E315D 315D Excavator Swing Gearbox 199-4602 Heat Treatment for sale
China E315D 315D Excavator Swing Gearbox 199-4602 Heat Treatment for sale
  1. China E315D 315D Excavator Swing Gearbox 199-4602 Heat Treatment for sale
  2. China E315D 315D Excavator Swing Gearbox 199-4602 Heat Treatment for sale
  3. China E315D 315D Excavator Swing Gearbox 199-4602 Heat Treatment for sale
  4. China E315D 315D Excavator Swing Gearbox 199-4602 Heat Treatment for sale

E315D 315D Excavator Swing Gearbox 199-4602 Heat Treatment

Price 200.00-800.00USD
MOQ 1
Delivery Time 1-3days
Brand TGFQ
Place of Origin CHINA
Model Number E315D 315D
Packaging Details NNER PACKING: Wrap by plastic film, clear label for each item. OUTER PACKING: Carton or Plywood Case PACKING SIZE: Depend on packing type
Payment Terms L/C, T/T, D/P, D/A
Supply Ability 1000 pcs / month

Product Details

Product Specification

Place of Origin CHINA Part Number 199-4602
Packaging Details NNER PACKING: Wrap by plastic film, clear label for each item. OUTER PACKING: Carton or Plywood Case PACKING SIZE: Depend on packing type Product Name E315D Excavator Swing Drvice
Motor No. SG04 Motor Model Number E315D 315D
Supply Ability 1000 pcs / month Brand Name TGFQ
Payment Terms L/C, T/T, D/P, D/A Applicable Industries Machinery Repair Shops, Energy & Mining
Price 200.00-800.00USD Delivery Time 1-3days
Minimum Order Quantity 1 Model E315D 315D
Package Size 45*45*55 CM

Product Description

China Made TGFQ Brand High Quality E315D 315D Excavator Swing Gearbox

Quick Details

Model:E315D 315D
Brand: TGFQ
Part Number: 199-4602
Part Name: Excavator Swing Drive
Weight: 120KG
Process: Heat Treatment

Product Photo:

Drawing:

S/N CJN1-2599
PART OF 199-4600, 267-6779, 367-8273 DRIVE GP-SWING

Pos. Part No Qty Parts name
1 191-2600 [3] GEAR-PLANETARY
2 191-2599 [1] CARRIER-PLANETARY
3 191-2604 [3] PIN-SPRING
4 191-2603 [3] SHAFT-PLANETARY
5 199-4628 [3] SHAFT-PLANETARY
6 191-2605 [1] WASHER (30X75X3-MM THK)
7 199-4629 [1] GEAR-SUN
8 199-4630 [1] GEAR-SUN
9 114-8224 M [1] BOLT (M20X1.5-THD)
10 199-4631 [1] GEAR-RING
11 093-6089 [2] DOWEL
12 095-0893 [1] PIN-SPRING
13 7I-7625 [1] BEARING AS-ROLLER
14 199-4638 [1] HOUSING
15 199-4632 [1] SHAFT-PINION
16 199-4636 [1] SPACER
17 199-4627 [6] WASHER
18 199-4634 [1] SPACER
19 199-4635 [1] SPACER
20 199-4637 [1] SPACER
21 148-4744 [1] BEARING AS
22 8T-4195 M [9] BOLT (M10X1.5X30-MM)
23 8T-4121 [9] WASHER-HARD (11X21X2.5-MM THK)
24 102-6495 [1] SEAL
25 148-4748 [1] CAGE
26 148-4747 [1] SPACER (29.5-MM THK)
27 1U-8846 B [1] SEALANT-GASKET
28 148-4751 [1] SPACER (8.3-MM THK)
  148-4752 B [1] SPACER (8.275-MM THK)
  148-4754 B [1] SPACER (8.25-MM THK)
  148-4755 B [1] SPACER (8.225-MM THK)
  148-4756 B [1] SPACER (8.2-MM THK)
  148-4757 B [1] SPACER (8.175-MM THK)
  148-4758 B [1] SPACER (8.15-MM THK)
  148-4759 B [1] SPACER (8.125-MM THK)
  148-4760 B [1] SPACER (8.1-MM THK)
  148-4761 B [1] SPACER (8.075-MM THK)
  148-4762 B [1] SPACER (8.05-MM THK)
  148-4763 B [1] SPACER (8.025-MM THK)
  148-4764 B [1] SPACER (8-MM THK)
  169-5520 B [1] SPACER (7.95-MM THK)
  169-5521 B [1] SPACER (7.9-MM THK)
  169-5522 B [1] SPACER (7.85-MM THK)
  169-5523 B [1] SPACER (7.8-MM THK)
29 199-4624 [1] CARRIER-PLANETARY
30 114-8223 [1] RETAINER
31 8C-3347 [3] PIN-ROLL
32 191-2602 [6] WASHER (32X56X1.2-MM THK)
33 191-2601 [3] BEARING
34 199-4625 [3] GEAR-PLANETARY
35 199-4626 [3] BEARING
  B   USE AS REQUIRED
  M   METRIC PART

Packaging Details:
1.According to orders,pack the spare parts one by one by oil paper.
2.Put them into small carton boxes one by one.
3.Put the packed small carton boxes into bigger carton boxes one by one.
4.Put the bigger carton boxes into wooden boxes if necessary especially for the shipments by sea.
5. Goods is packed by oil paper and plastic bags inside.
6.Using wooden case package.

 

 

 

OUR STOCK

We have more than 4000 square meters of three-dimensional warehouse and more than 2000 square meters of outdoor warehouse
It ensures that we have sufficient inventory and respond to customers' needs faster. Fast delivery is our advantage

FAQ:
Common problem:
Q: What can you do
A: We can provide you with digging final drive and swing drive motors and reducer gearbox and their parts


Q: How can i get the price?
A:  We usually quote within 24 hours after we get your inquiry(Except weekend and holidays). If you are very urgent to get the price, please email        us or contact us in other ways so that we can offer you a quote.


Q: Can I order one of our samples for testing first?
A: Of course!


Q: How do I order?
A: You need to tell us the model and quantity you are interested in, and then we will issue a proforma invoice for you. The goods will be prepared after receiving the payment. The preparation time depends on the content of the order


Q: Do you have a factory?
A: Yes, we have our own factory and have 23 years of production experience in the excavated gear industry.

 

Guangzhou Tiangong Machinery Equipment Co., Ltd.

Manufacturer, Trading Company
  • Annual Revenue: 10 million-15 million
  • Employees: >150
  • Year Established: 2000