Forging Sumitomo SH350-3 Excavator Planetary Gear Speed Reducer LN001980
TGFQ Sumitomo SH350-3 Excavator Planetary Gear Speed Reducer LN001980
Product Specifications
| Description |
Sumitomo Travel Gearbox |
| Production Methods |
Casting & Forging |
| Place of Origin |
Guangzhou |
| Model |
SH350-3 |
| Part Number |
LN001980 / KSA10220 / KSA10221 |
| H.S Code |
8483409090 |
| Size |
18/26Holes |
Product Photos
Technical Drawing & Parts List
| Pos. |
Part No |
Qty |
Parts Name |
Comments |
| . | KBA10750 | [1] | MOTO-REDUCTION GEAR | SUM Includes All Parts On Figures 06-02 - 06-04 Superseded by part number: LJ018700, LN001980 |
| . | LJ018700R | [1] | REMAN-HYD MOTOR | RAC CX290B CRAWLER EXCAVATOR TIER 3 (NA) (1/07-), ASSY, Reman for New PN KBA10750 |
| . | LJ018700C | [1] | CORE-MOTOR HYDRAULIC | RAC Return Number |
| . | LN001980 | [1] | REDUCER | SUM Motor, Piston; Incl. 2 - 35 |
| 2 | LT00126 | [1] | HOUSING | SUM |
| 3 | LB00791 | [2] | BEARING, BALL | SUM |
| 4 | LC002980 | [1] | RING GEAR | SUM |
| 5 | 863-18100 | [22] | HEX SOC SCREW,M18 x 100mm, Cl 12.9 | CAS |
| 6 | LE00993 | [1] | SEAL | SUM |
| . | LH00388 | [1] | SHIM | SUM Incl. 8 - 14 |
| 8 | LH00421 | [1] | SHIM,1.3mm Thk | SUM |
| 9 | LH00422 | [1] | SHIM,1.4mm Thk | SUM |
| 10 | LH00423 | [1] | SHIM,1.5mm Thk | SUM |
| 11 | LH00424 | [1] | SHIM,1.6mm Thk | SUM |
| 12 | LH00425 | [1] | SHIM,1.7mm Thk | SUM |
| 13 | LH00426 | [1] | SHIM,1.8mm Thk | SUM |
| 14 | LH00427 | [1] | SHIM,1.9mm Thk | SUM |
| 15 | LA00832 | [2] | LOCK WASHER | SUM |
| 16 | LE00992 | [1] | RING | SUM |
| 17 | LN00120 | [1] | HOUSING | SUM |
| 18 | LC00202 | [3] | PLANETARY GEAR | SUM |
| 19 | LA00835 | [6] | WASHER | SUM |
| 20 | LB011160 | [3] | NEEDLE BEARING | SUM |
| 21 | LA00907 | [3] | PIN | SUM |
| 22 | 338W100Z056N | [3] | DOWEL | SUM |
| 23 | LC00201 | [1] | SUN GEAR | SUM |
| 24 | LN00119 | [1] | HOUSING | SUM |
| 25 | LC00199 | [3] | PLANETARY GEAR | SUM |
| 26 | LA00830 | [6] | WASHER | SUM |
| 27 | LB011170 | [3] | NEEDLE BEARING | SUM |
| 28 | LA00906 | [3] | PIN | SUM |
| 29 | 338W060Z036N | [3] | PIN | SUM Superseded by part number: 338W060Z036B |
| 30 | LC002990 | [1] | SUN GEAR | SUM |
| 31 | LR00857 | [1] | PLATE | SUM |
| 32 | LW005140 | [1] | COVER | SUM |
| 33 | 108R010Z025B | [18] | BOLT | SUM |
| 34 | LK00383 | [2] | PLUG | SUM |
| 35 | 154503A1 | [2] | O-RING | SUM |
Performance & Installation
Final Driving Installation Precautions:
Check the piping and flexible hose is correctly installed. Ensure correct direction of rotation of the motor is achieved. Check for leakage from all motor parts. Ensure the system is operating within the specified working temperature. Check the pressure is operating within specified range.
Diagnosis & Maintenance
- If motor is running with an unusual sound, unscrew the plug from the case drain and check whether the oil level is present. Add the oil level if required and ensure to bleed the trapped air from the circuit. Also check the oil quality; if impurities are present, replace the oil and keep it clean to maintain the life of the Track Drive Motor.
- If you still experience abnormal operation of the motor, check the pressure throughout the work circuit to assess whether or not the motor is breakdown.
Our Stock & Capabilities
We have more than 4000 square meters of three-dimensional warehouse and more than 2000 square meters of outdoor warehouse. It ensures that we have sufficient inventory and respond to customers' needs faster. Fast delivery is our advantage.
Frequently Asked Questions
What can you do?
We can provide you with digging final drive and swing drive motors and reducer gearbox and their parts.
Do you accept OEM or ODM?
Yes, you just need to provide your logo file or ideas.
Can I order one of our samples for testing first?
Of course!
How do I order?
You need to tell us the model and quantity you are interested in, and then we will issue a proforma invoice for you. The goods will be prepared after receiving the payment. The preparation time depends on the content of the order.
Do you have a factory?
Yes, we have our own factory and have 23 years of production experience in the excavated gear industry.