500gsm Thermal Bonding Shoddy Nonwoven Felt Making Machine

Price negotiation
MOQ 1 set
Delivery Time 120 days.
Brand HONGE
Place of Origin China
Certification ISO9001/CE
Model Number HYL-QLFZ
Packaging Details PE film or naked.
Payment Terms L/C, T/T
Supply Ability 1 or 2 lines per 120 days.

Product Details

Product Specification

Place of Origin China Trim width 2600mm
Packaging Details PE film or naked. Material Shoddy fiber, polyester fiber, low melt fiber, wool, etc.
Specfcation of fiber 1.5D-15D*51mm-72mm Weight range 500gsm-5000gsm
Model Number HYL-QLFZ Supply Ability 1 or 2 lines per 120 days.
Certification ISO9001/CE Brand Name HONGE
Payment Terms L/C, T/T Price negotiation
Delivery Time 120 days. Product name Airlaid+thermal bonding shoddy felt production line
Minimum Order Quantity 1 set Production capacity Max. 1000kg/h

Product Description

1000kg/h Airlai+thermal bonding technology nonwoven shoddy felt production line

 

 

Production line description:

  • This air laid thermal bonding wadding production line uses low melt fiber or bi-component fiber mixed with normal polyester fiber in properties to create stiff waddings, or such as foam replacements for quilts, cushion, mattress, acoustic and insulation materials, etc.
  • Also able to make soft wadding for interlinings such as home textiles, garments, furniture, toys, etc.
  • The material after forming into a batt is passed through a thermal-bonded oven with stainless steel or teflon belt dependent on the products where fitted the top belt is a movable compression belt.
  • However, for soft waddings, eg. lofty material below 1500gram per square meter. It is normal to use Teflon belts for the oven machine.

Technical parameters:

Working width 2600mm

Weight range

500gsm-5000gsm

Raw material

1.5D-15D*38mm-51mm shoddy fiber,polyester fiber, low melt fiber, wool, etc.
Process technology Airlaid+Thermal bonding process
Production capacity max. 1000kg/h
Applications quilts, mattress, furniture, garments, insulation materials, etc.
Installed power Depends.

 

Trade information:

Trade terms FOB, CNF, or CIF
Lead time 120 days after deposit.
Payment terms 30% advance payment, 70% paid off before delivery.
Warranty twelve (12) months after mechanical and electrical commissioning.
After-sale service The seller is responsible for installation and debugging. The buyer is responsible for the round-trip airplane tickets, accommodation, medical treatment, safety and relative fees. In addition the buyers should assign translator, workers, electrical cable (from machines to control panel and from power to control panel) and tools for installation to cooperate with the work. Installation cost is USD180/Day/engineer and totally installation period is about 30-40 days depending on well cooperation of the buyer.

 

 

 

 

Products and applications for reference:

 

 

 

 

CHANGSHU HONGYI NONWOVEN MACHINERY CO., LTD

Manufacturer, Exporter, Seller, Other
  • Employees: >100
  • Year Established: 2014