Price | negotitable |
MOQ | 2sets |
Delivery Time | 30 days |
Brand | HONGYI |
Place of Origin | China |
Certification | ISO9001, CE |
Model Number | HYKS |
Packaging Details | PE film |
Payment Terms | L/C, T/T |
Supply Ability | 5 sets per month |
Place of Origin | China | Warranty | 12 months |
Packaging Details | PE film | Color | customized |
Model Number | HYKS | Supply Ability | 5 sets per month |
Certification | ISO9001, CE | Brand Name | HONGYI |
Payment Terms | L/C, T/T | Cylinder | pin board or carding wire |
Working width | 1000mm-1500mm | Price | negotitable |
Delivery Time | 30 days | Product name | Fiber opening machine |
Capacity | 250kg/h-650kg/h | Minimum Order Quantity | 2sets |
Production time: | 25-30 days |
Sofa Cushion Pillow Filling Machine PP Polyester Fiber Ball Making Machine Opening Machinery
1.
It
is
mainly
used
for
producing
PEARL
spherical
cotton
products
by
silicon
empty
cotton.
This
kind
of
cotton
products
is
used
in
garment,
bedding,
pillow,
and
other
stuffing
object.
It
can
make
the
products
look
richer,
and
more
spring.
2.
This
machine
can
adjust
the
size
of
sphericity
and
degree
of
tightness.
This
machine
is
often
matched
with
storage
box
or
mixing
machine
and
filling
machine.
Functionality & application:
1. Preliminary opening the raw material fibers,
2. While it also helps to filter off impurities and mix the fibers.
3. Available for opening various fibers
Features:
1. Photoelectric and automated control for quantity feeding
2. High efficiency and minimized impairment of fiber.
3. Enclosed design largely reducing the dust and flocks.
4. Convenient maintenance
Technical parameters:
Working width | 1000mm, 1300mm, 1500mm |
Capacity | 250kg/h, 500kg/h, 650kg/h |
Rotary speed | 900RPM |
Opening method | Pin board, carding wire |
Installed power | 15.2Kw |
Trade information:
Trade terms | FOB, CNF, or CIF |
Lead time | 90 days after deposit. |
Payment terms | 30% advance payment, 70% paid off before delivery. |
Warranty | twelve (12) months after mechanical and electrical commissioning. |
After-sale service |
The seller is responsible for installation and debugging. The buyer is responsible for the round-trip airplane tickets, accommodation, medical treatment, safety and relative fees. In addition the buyers should assign translator, workers, electrical cable (from machines to control panel and from power to control panel) and tools for installation to cooperate with the work. Installation cost is USD180/Day/engineer and totally installation period is about 30-40 days depending on well cooperation of the buyer. |