| Price | Sent email to us |
| MOQ | 1000PCS |
| Delivery Time | 15-25days |
| Brand | KOKA |
| Place of Origin | Shanghai |
| Certification | ISO9001-2015 |
| Model Number | CC-1/4 |
| Packaging Details | Plastic bags+Carton Box+Pallet |
| Payment Terms | L/C, D/A, D/P, T/T, Western Union, MoneyGram |
| Supply Ability | 99999 pcs/month |
| Usage | HVAC | Place of Origin | Shanghai |
| Packaging Details | Plastic bags+Carton Box+Pallet | Color | White/Yellow Zinc/Gold Zinc |
| Cushion Material | TPE | Service | ODM/OEM |
| Material | Q235,Stainless Steel 304/316 | Model Number | CC-1/4 |
| Supply Ability | 99999 pcs/month | Certification | ISO9001-2015 |
| Brand Name | KOKA | Payment Terms | L/C, D/A, D/P, T/T, Western Union, MoneyGram |
| Price | Sent email to us | Delivery Time | 15-25days |
| Minimum Order Quantity | 1000PCS | Surface Treatment | Zinc Plated /Galvanized/HDG/Copper Plate |
| Package | Carton Box |
OEM TPE Strut Cushion Clamps 3/8''Inch Unistrut Channel Clamp Gold Zinc
Products:Cushion Clamp
Slide multiple clamps into existing strut channel to organize lines of pipe, tubing, and conduit without the need for drilling, welding, or using adhesive. Clamps have a plastic or rubber cushion or body to reduce vibration.
TPE clamps hold lines of pipe, tubing, and conduit in light duty applications without the need for fasteners or installation tools. Made from a single piece of rubber, they prevent corrosion caused by metal-to-metal contact and resist most oils, chemicals, and cleaning compounds. To install, insert the clamp into strut channel and twist it 90° to secure. Then, press material into the clamp.
Features:
1)
Stud
Securely
fastened
to
one
clamp
half.
2)
Nylon
insert
nut
assures
a
positive
lock
.
3)
Cushion
material
is
a
thermoplastic
elastomer
resistant
to
most
fuels,
oils,gases,
greases,
solvents,
mineral
acids,
chemicals
and
industrial
cleaners,Temperature
range
-65°F
to
+275°F
4)
Available
size
from
1/4"
-
6Pipe"
5) Fast and simple installation - one person/one tool required.
6) Modular design allows adding or changing piping without disturbing adjacent tube.
7) Tube sizes can be mixed to suit installation requirments.
Specifications:
| Part No. | Tubing Size | Pipe Size | Pipe OD (inch) | Finish |
| CC-1/4 | 1/4” | - | 0.25 | GOLD ZINC/EG/HDG/SS304/SS316 |
| CC-3/8 | 3/8” | - | 0.37 | GOLD ZINC/EG/HDG/SS304/SS316 |
| CC-1/2 | 1/2” | - | 0.5 | GOLD ZINC/EG/HDG/SS304/SS316 |
| CC-1/4-P | - | 1/4” | 0.54 | GOLD ZINC/EG/HDG/SS304/SS316 |
| CC-5/8 | 5/8” | - | 0.62 | GOLD ZINC/EG/HDG/SS304/SS316 |
| CC-3/8-P | - | 3/8” | 0.67 | GOLD ZINC/EG/HDG/SS304/SS316 |
| CC-3/4 | 3/4” | - | 0.75 | GOLD ZINC/EG/HDG/SS304/SS316 |
| CC-1/2-P | - | 1/2” | 0.84 | GOLD ZINC/EG/HDG/SS304/SS316 |
| CC-7/8 | 7/8” | - | 0.87 | GOLD ZINC/EG/HDG/SS304/SS316 |
| CC-1 | 1” | - | 1.00 | GOLD ZINC/EG/HDG/SS304/SS316 |
| CC-3/4-P | - | 3/4” | 1.05 | GOLD ZINC/EG/HDG/SS304/SS316 |
| CC-1 1/8 | 1-1/8” | - | 1.12 | GOLD ZINC/EG/HDG/SS304/SS316 |
| CC-1 1/4 | 1-1/4” | - | 1.25 | GOLD ZINC/EG/HDG/SS304/SS316 |
| CC-1-P | - | 1” | 1.31 | GOLD ZINC/EG/HDG/SS304/SS316 |
| CC-1 3/8 | 1-3/8” | - | 1.37 | GOLD ZINC/EG/HDG/SS304/SS316 |
| CC-1 1/2 | 1-1/2” | - | 1.50 | GOLD ZINC/EG/HDG/SS304/SS316 |
| CC-1 5/8 | 1-5/8” | - | 1.62 | GOLD ZINC/EG/HDG/SS304/SS316 |
| CC-1 1/4-P | - | 1-1/4” | 1.66 | GOLD ZINC/EG/HDG/SS304/SS316 |
| CC-1 3/4 | 1-3/4” | - | 1.75 | GOLD ZINC/EG/HDG/SS304/SS316 |
| CC-1 7/8 | 1-7/8” | 1-1/2” | 1.90 | GOLD ZINC/EG/HDG/SS304/SS316 |
| CC-2 | 2” | - | 2.00 | GOLD ZINC/EG/HDG/SS304/SS316 |
| CC-2 1/8 | 2-1/8” | - | 2.12 | GOLD ZINC/EG/HDG/SS304/SS316 |
| CC-2 1/4 | 2-1/4” | - | 2.25 | GOLD ZINC/EG/HDG/SS304/SS316 |
| CC-2 3/8 | 2-3/8” | 2” | 2.37 | GOLD ZINC/EG/HDG/SS304/SS316 |
| CC-2 1/2 | 2-1/2” | - | 2.50 | GOLD ZINC/EG/HDG/SS304/SS316 |
| CC-2 5/8 | 2-5/8” | - | 2.62 | GOLD ZINC/EG/HDG/SS304/SS316 |
| CC-2 7/8 | 2-7/8” | 2-1/2” | 2.87 | GOLD ZINC/EG/HDG/SS304/SS316 |
| CC-3 | 3” | - | 3.00 | GOLD ZINC/EG/HDG/SS304/SS316 |
| CC-3 1/8 | 3-1/8” | - | 3.12 | GOLD ZINC/EG/HDG/SS304/SS316 |
| CC-3 1/2 | 3-1/2” | 3” | 3.50 | GOLD ZINC/EG/HDG/SS304/SS316 |
| CC-3 5/8 | 3-5/8” | - | 3.62 | GOLD ZINC/EG/HDG/SS304/SS316 |
| CC-4 1/8 | 4-1/8” | - | 4.12 | GOLD ZINC/EG/HDG/SS304/SS316 |
| CC-4 1/2 | 4-1/2” | 4” | 4.50 | GOLD ZINC/EG/HDG/SS304/SS316 |
| CC-6 | 6” | - | 6.00 | GOLD ZINC/EG/HDG/SS304/SS316 |
Product Show:



Package:
Shanghai KoKa Industrial Co.,Ltd is a professional cable management systems (CMS) & Strut Framing systems and HVAC systems solutions provider,manufacturer .
Based on over 15 years of engineering experience to the subways, airports, shopping malls, food, beverage, petrochemical ,and pharmaceutical industries, the KOKA production of stainless steel products has become a respected and specified brand to some of the world's most recognised organisations.
KOKA products are known throughout the industry as being hygienic, high quality and to offer exceptional value.
KOKA offer an extensive range of products ex-stock and can therefore process your orders with a short lead time, with the majority of parts available on a next day delivery.
KOKA specialises in manufacturing the following products in SS304 , SS316 ,carbon steel.
KOKA to provide personalized demand and global sourcing solutions for global customers,always adhere to the product quality first,Continuous development and optimization design, with user-friendly, simple installation to satisfied customer needs, and strive to reduce customer costs, to adapt to the global competition, With global customers to cope with the complex economic environment, to achieve common value growth of the target.
FAQ:
Q1:
Are
you
manufacturer?
A:
Yes,we
are
factory
,We
have
stamping
and
injection
factories.
Q2:
What
services
can
we
offer?
A:
We
can
OEM
and
ODM,We
have
a
strong
design
team,we
can
provide
drawing.
Q3:
What
information
need
for
quotation?
A:
For
example:
1: what material(carbon steel/Q235/SS304/SS316)