Price | Negotiable |
MOQ | Negotiable |
Delivery Time | 7-10 work days after received the payment |
Brand | ZhenAn |
Place of Origin | China |
Certification | ISO9001:2015 |
Model Number | electrolytic manganese |
Packaging Details | 1MT big bag or as per customer request |
Payment Terms | L/C, T/T, Western Union |
Supply Ability | 2000MT/per Month |
Place of Origin | China | Packaging Details | 1MT big bag or as per customer request |
Carbon Content | Less Than 0.04% | Material | Mn |
Model Number | electrolytic manganese | Supply Ability | 2000MT/per Month |
Certification | ISO9001:2015 | Product nickname | electrolytic manganese |
Brand Name | ZhenAn | Payment Terms | L/C, T/T, Western Union |
Price | Negotiable | Delivery Time | 7-10 work days after received the payment |
Product Type | Sheet | Minimum Order Quantity | Negotiable |
Strict control of process parameters is essential to ensure safety, efficiency, and product quality. Additionally, waste gases, solid waste, and wastewater generated during production must be properly treated to minimize environmental impact.
Electrolytic manganese is widely used in various industries, including:
Continuous technological innovation and process optimization help improve product quality, reduce resource consumption, and lower production costs, contributing to the sustainable development of the manganese industry.
Electrolytic Manganese Metal Flakes | |||||
Spec | Mn | C | S | P | Fe+Si+Se |
≥ | ≤ | ||||
99.70% | 0.04% | 0.05% | 0.005% | 0.205% | |
Size | In flakes | ||||
Packing | In big bags of 1000kgs net each |
All
our
products
support
any
third-party
inspection.
With
30
years
of
experience,
we
have
extensive
expertise
in
exporting
ferrovanadium
and
silicon
carbide
to
Europe.
Our
considerable
stock
ensures
short
delivery
times,
and
we
offer
flexible
payment
options,
including
TT/LC.
MOQ
and
sample:
Negotiable
Q:
Are
you
a
factory
or
trading
company?
A:
We
are
both
a
factory
and
a
trading
company.
Q:
How
to
place
an
order?
A:Buyer
sends
an
inquiry.
Receive
Guohan
Steel's
quotation.
Order
confirmation.
Buyer
arranges
a
30%
deposit.
Production
starts
after
deposit
is
received.
Strict
inspection
during
production.
Buyer
arranges
balance
payment.
Packing.
Delivery
according
to
trade
terms.