| Price | Negotiable |
| MOQ | Negotiable |
| Delivery Time | 7-10 work days after received the payment |
| Brand | ZhenAn |
| Place of Origin | China |
| Certification | ISO9001:2015 |
| Model Number | electrolytic manganese |
| Packaging Details | 1MT big bag or as per customer request |
| Payment Terms | L/C, T/T, Western Union |
| Supply Ability | 2000MT/per Month |
| Place of Origin | China | Packaging Details | 1MT big bag or as per customer request |
| Carbon Content | Less Than 0.04% | Material | Mn |
| Model Number | electrolytic manganese | Supply Ability | 2000MT/per Month |
| Certification | ISO9001:2015 | Product nickname | electrolytic manganese |
| Brand Name | ZhenAn | Payment Terms | L/C, T/T, Western Union |
| Price | Negotiable | Delivery Time | 7-10 work days after received the payment |
| Product Type | Sheet | Minimum Order Quantity | Negotiable |
The smelting stage involves two main methods:
Pyrometallurgical
Smelting:
This
method
involves
placing
the
manganese
ore
and
a
reducing
agent
(such
as
coke
or
coal)
into
a
high-temperature
furnace.
The
high
temperatures
trigger
a
chemical
reaction
that
extracts
metallic
manganese
from
the
ore.
Hydrometallurgical
Smelting:
In
this
method,
the
ore
undergoes
a
leaching
process,
where
it
is
treated
with
an
acidic
or
alkaline
solution
to
dissolve
manganese.
The
resulting
manganese-containing
solution
is
then
subjected
to
chemical
reduction,
which
converts
it
into
manganese
oxide
powder.

| Electrolytic Manganese Metal Flakes | |||||
| Spec | Mn | C | S | P | Fe+Si+Se |
| ≥ | ≤ | ||||
| 99.70% | 0.04% | 0.05% | 0.005% | 0.205% | |
| Size | In flakes | ||||
| Packing | In big bags of 1000kgs net each | ||||
All
our
products
support
any
third-party
inspection.
With
30
years
of
experience,
we
have
extensive
expertise
in
exporting
ferrovanadium
and
silicon
carbide
to
Europe.
Our
considerable
stock
ensures
short
delivery
times,
and
we
offer
flexible
payment
options,
including
TT/LC.
MOQ
and
sample:
Negotiable
Q:
Are
you
a
factory
or
trading
company?
A:
We
are
both
a
factory
and
a
trading
company.
Q:
How
to
place
an
order?
A:Buyer
sends
an
inquiry.
Receive
Guohan
Steel's
quotation.
Order
confirmation.
Buyer
arranges
a
30%
deposit.
Production
starts
after
deposit
is
received.
Strict
inspection
during
production.
Buyer
arranges
balance
payment.
Packing.
Delivery
according
to
trade
terms.