Price | Negotiable |
MOQ | Negotiable |
Delivery Time | 5-10 work days after received the payment |
Brand | ZHENAN |
Place of Origin | China |
Certification | ISO9001 |
Model Number | RP/HP/UHP Graphite Electrodes |
Packaging Details | 1MT big bag or as per customer request |
Payment Terms | L/C, T/T, Western Union |
Supply Ability | 2000MT/per Month |
Place of Origin | China | Resistance (μω.m) | 5.5, 4 - 9 Micro Ohm.m, 4.8-5.8μΩm, 5.5-6.5 ohm, 6.0-9.5 |
Packaging Details | 1MT big bag or as per customer request | Grade | UHP (Ultra High Power), HP (High Power), RP (Regular Power), UHP, RP |
Model Number | RP/HP/UHP Graphite Electrodes | Supply Ability | 2000MT/per Month |
Certification | ISO9001 | Brand Name | ZHENAN |
Payment Terms | L/C, T/T, Western Union | Thermal expansion | 1.5, 1.1-1.4, ≤2.8, 2.3-2.1, 1.5 - 2.8 X10-6 / (100-600 ) |
Type | Electrode Block, Electrode Powder, Electrode Bolt, graphite electrode with nipples, Generator | Price | Negotiable |
Delivery Time | 5-10 work days after received the payment | Length | 1600~2400mm, 1500mm-2700mm, 250 - 2400mm, 2700, 1800-2700 |
Minimum Order Quantity | Negotiable | Apparent density (g/cm³ ) | 1.58 - 1.76 G/cc, 1.6-1.9, 1.68-1.75g/cm3, 1.58-1.75, 1.55-1.69 G/cc |
Advantages of High-Power Graphite Electrodes
Using
high-power
graphite
electrodes
in
the
400-600
US
cents
range
has
several
advantages
over
traditional
electrodes.
One
of
the
main
benefits
is
improved
energy
efficiency,
leading
to
lower
production
costs.
These
electrodes
have
a
longer
lifespan
than
traditional
electrodes,
reducing
downtime
and
maintenance
costs.
Additionally,
they
have
a
higher
thermal
conductivity,
enabling
more
uniform
heating
of
the
produced
metal.
Graphite Electrode Current Carrying Capacity
Nomina diameter | RP | HP | UHP | ||||
Current Carrying Capacity | Current Density | Current Carrying Capacity | Current Density | Current Carrying Capacity | Current Density | ||
in | mm | A | A/cm2 | A | A/cm2 | A | A/cm2 |
12 | 300 | 10000-13000 | 14-18 | 13000-17400 | 17-24 | 15000-22000 | 20-30 |
14 | 350 | 13500-18000 | 14-18 | 17400-24000 | 17-24 | 20000-30000 | 20-30 |
16 | 400 | 18000-23500 | 14-18 | 21000-31000 | 16-24 | 25000-40000 | 19-30 |
18 | 450 | 22000-27000 | 13-17 | 25000-40000 | 15-24 | 32000-45000 | 19-27 |
20 | 500 | 25000-32000 | 13-16 | 30000-48000 | 15-24 | 38000-55000 | 18-27 |
22 | 550 | 32000-40000 | 13-16 | 35000-55000 | 14-22 | 42000-64000 | 17-26 |
24 | 600 | 35000-41000 | 13-15 | 41000-61000 | 14-21 | 50000-73000 | 17-25 |
28 | 700 | 39000-48000 | 10-12 | 55000-82000 | 14-21 | 67000-99000 | 17-25 |
32 | 800 | 43000-54000 | 8-10 | / | / | / | / |
Packing & Delivery
REMARK:
the
above
data
is
just
on
standard
of
YB/T,
the
actual
product
is
big
different
from
the
above.
For
the
actual,
be
free
to
contact
us,
please.
Service:
We
can
supply
you
with
free
samples,
a
booklet,
a
laboratory
test
report,
an
Industry
Report,
etc.
Welcome
to
our
factory
and
company
for
a
visit!
Company
profile
ZHENAN has been in the business of ferroalloy for 3 years now. It is a leading manufacturer and supplier of ferro silicon,silicon manganese,silicon metal,silicon carbide,high carbon silicon and so on.our company is a large-sized production enterprise integrating research, development, production and sales.
Our company locates in Anyang city,Henan province of China a total area of about 15,000 square.With many years growing and developing,our company has domestic advanced smelting furnaces,crushing and screening production lines with annual output of 20000 tons.At the some time has two laboratories and a metallurgical materials testing center with dozens of senior researchers.The products are supplied to many large and medium-sized iron and steel enterprises in China, and exported to Japan, Korea, India, Europe and the United States.
RFQ
Q:
Are
you
a
manufacture
or
trader?
A:
We
are
truly
a
manufacturer,
we
not
only
can
provide
the
high
quality
products
with
the
best
price,
but
also
can
offer
the
best
pre-sale
service
and
after-service.
Q
:
What
standards
do
you
have?
A
:
Our
products
meet
the
standards,
such
as
ASTM,
ASME,
AMS,
DIN,
JIS
etc.The
third
party
testing
is
all
available
for
us.
Q : What is your lead time?
A : It usually needs about 15- 20 days after receiving the PO.