| Price | Negotiable |
| MOQ | No MOQ Requirement |
| Delivery Time | 15-20 Days |
| Brand | HMT |
| Place of Origin | Guangdong, China |
| Certification | ISO9001 |
| Model Number | Custom |
| Packaging Details | -Carton box with appropriate paperboard thickness -Inside care with bubble wrap or protective foam -Double inside care with cushioning materials |
| Payment Terms | Western Union, T/T |
| Supply Ability | 100000pcs/month |
| Place of Origin | Guangdong, China | Sample | 10 pcs free samples |
| Packaging Details | -Carton box with appropriate paperboard thickness -Inside care with bubble wrap or protective foam -Double inside care with cushioning materials | Mould Life | 500,000-1,000,000 Shots |
| Model Number | Custom | Supply Ability | 100000pcs/month |
| Certification | ISO9001 | Logo | customized logo as your requirement |
| Brand Name | HMT | Payment Terms | Western Union, T/T |
| Price | Negotiable | Delivery Time | 15-20 Days |
| Minimum Order Quantity | No MOQ Requirement | Surface Treatment | Heat Treatment |
| Width | As to your requirements |
Customized 7075 Aluminum Die Casting Parts Heat Treatment Silver Plating
| Main Product | CNC Milling, Plastic Mould/Tooling, Prototype,Injection Molding Product, Injection Foaming Mold, 3D Printing,Die Casting, Gas Assisted Injection Molding such as part for Auto, Medcial, Aerospace, Houseware… |
| Mould Base | SD,LKM Standard, HASCO Standard Self-made, etc. |
| Mould Material | P20/718/738/NAK80/S136/2738/2316/H13, etc. |
| Moud Precision | +/-0.01mm |
| Mould Life | 50-500K shots |
| Mould Cavity | Single cavity, multi-cavity |
| Runner System | Hot runner and cold runner |
| GateType | Pinpoint Gate, Edge Gate, Sub Gate, Film Gate, Valve Gate, Open Gate, etc. |
Why Choose Us
1. Get your quotation within 6 hours;
2. Get your technology answers fastly;
3. High skilled English communicaton fastly;
4. Online service 24 * 7 hours.
1. Quality is our soul and culture;
2. ISO9001:2015 qualified factory;
3. Money will be returned to you if bad quality;
4. Strict QC before delivery.
Powerful Production
1.
In-house
moulds
fabrication;
2.
High
volume
production
reaches
10000pcs
per
day;
3.
From
simple
to
complex
shapes
4.
From
small
to
big
sizes
1. Inspect raw material before producing;
2. Inspect tools and machines before producing;
3. QC during producing;
4. Finally inspection before shipping.
1. NDA signatue before cooperation;
2. Technology security during production;
3. Your information in confidence;
4. Alibaba trade assurance to have your money safe.
1. Rapidly making samples within 7 days;
2. Fast production and packing;
3. In time or in advance delivery as promised before order;
4. Delivery with perfect goods.
Welcome to Get a Quote