Price | Negotiable |
MOQ | 1 Unit |
Delivery Time | 7-20 Working Days |
Brand | Putzmeister |
Place of Origin | Germany |
Certification | ISO90001.SAE |
Model Number | SG5267THB |
Packaging Details | RORO Ship, Cargo Bulk Ship |
Payment Terms | T/T |
Supply Ability | 10 Units Per Month |
Condition | Used | Max Concrete Output | 90 M3/h |
Chassis | Volvo | Power Type | Diesel |
Chassis Model | FM9 340 | Place of Origin | Germany |
Packaging Details | RORO Ship, Cargo Bulk Ship | Dimension(L*W*H) | 25720kg |
Model Number | SG5267THB | Supply Ability | 10 Units Per Month |
Certification | ISO90001.SAE | Weight | 39850kg |
Brand Name | Putzmeister | Payment Terms | T/T |
Video outgoing-inspection | Provided | Marketing Type | Ordinary Product |
Price | Negotiable | Delivery Time | 7-20 Working Days |
Minimum Order Quantity | 1 Unit | Power | 230kw |
Second Hand 36M Putzmeister Concrete Pump Truck With Volvo
All
parts
and
whole
machine
is
in
good
condition.
Besides,
we
could
provide
all
model
second
hand
excavator
and
all
in
good
condition.
If
you
want
to
import
good
quality
second
hand
pump
truck,
I
am
sure
we
are
your
best
choice!
Welcome
to
visit
our
company
and
have
a
try
of
our
machine.
Item | Content |
Chassis maintenance | repair & replace vehicle lighting |
replace bumpers | |
replace vehicle interior accessories | |
replace tires | |
replace brakes | |
replace gear box & gear oil | |
replace filters | |
inspect & maintain axles | |
inspect & maintain engine | |
Wearing parts replacement | replace delivery cylinder |
replace transmission sleeve | |
replace wear plate | |
replace cutting ring | |
replace concrete piston | |
replace S tube | |
replace pipelines | |
replace rubber hose | |
replace coupling , sealing rings | |
replace grease pump & oil separator | |
replace bucket sealings | |
replace mixing blade | |
replace bearings and seats | |
replace mesh | |
Cleaning & painting | high-pressure washing |
surface cleaning and polishing | |
putty painting | |
Control system repair | replace control cabinet |
replace wires | |
replace switches | |
system improvement | |
replace remote charger & batteries | |
Hydraulic system repair | Replace leaked hoses & pipes |
calibrate oil pump | |
Replace damaged hydraulic pipelines | |
replace hydraulic oil | |
replace swing cylinder seal& bearing | |
replace content gauge | |
Covering replacement | replace station |
replace hopper upper | |
replace ladder & pedal | |
repair covering parts | |
Others | vehicle painting |
pre-delivery inspection | |
leakage inspection | |
pressure test of main oil pump & boom pump | |
water testing | |
replace reducer & gear oil | |
adjust lighting function | |
painting repair |
Q:Why
do
you
choose
us?
A:we
are
the
manufacturer,with
20
years
experience.
Q:What
is
your
Quality
Control
(QC)?
A:Third
Control,
ISO,CCC,CE
Certificate
,European
Certificate.
Q:How
to
visit
your
company?
A:Our
factory
is
in
Changsha
city,
Hunan
Province.
Q:which
countries
did
we
export?
A:
India,
Bangladesh,
Vietnam,
Vietnam,
and
the
Middle
East,
etc.
Q:Can
you
customize
your
products?
A:Yes,
we
will
do
the
customization
by
requirement
without
affecting
the
quality
of
the
products
Q:How
long
is
the
warranty
period
?
A:We
offer
12
months
warranty
for
the
machine
(main
body)
from
the
date
of
installation
finished.
Q:What's
the
payment
method
?
A:We
accept
L/C,
T/T
and
D/P
payment.