| Price | $0.07/Pieces 5000-9999 Pieces |
| MOQ | 5000 Pieces |
| Delivery Time | 25days |
| Brand | Yo Li O |
| Place of Origin | Jiangsu, China |
| Certification | SGS FDA |
| Model Number | TP-007 |
| Packaging Details | 1000PCS/CTN 8.8kg 50*40*36cm |
| Payment Terms | L/C, D/A, D/P, T/T, Western Union, MoneyGram |
| Supply Ability | 100000 pics per month |
| Usage | personal care/cosmetic packaging,Skin Care/ Cosmetic /Hand and body lotions | Place of Origin | Jiangsu, China |
| Use | Skin Care Cream/Hand wash | Packaging Details | 1000PCS/CTN 8.8kg 50*40*36cm |
| Color | gold | Material | Aluminium-Plastic, Plastic Aluminum |
| Plastic type | PP | Model Number | TP-007 |
| Supply Ability | 100000 pics per month | Certification | SGS FDA |
| Brand Name | Yo Li O | Payment Terms | L/C, D/A, D/P, T/T, Western Union, MoneyGram |
| Price | $0.07/Pieces 5000-9999 Pieces | Delivery Time | 25days |
| Product name | Treatment/Cream Pump | Minimum Order Quantity | 5000 Pieces |
PP screw cap accept OEM 18/410 18/415 20/410 24/410 treatment pump PP screw cap cream pump sprayer
Deraction
Easy to press, uniform discharge. According to the pressure of the size of the fluid, very smooth./n/nVacuum Pump Head, aseptic inner core. Foundation, essential oils and other liquids do not contact metal./n/nAn invisible anti-slip buckle is arranged around the bottle cap, which is compact and not easy to drop.
Important Parameter
|
Brand |
YoLiO |
Payment term |
T/T,L/C,Western Union 30% Pre-payment, Balance Before Shipment |
|
Type |
Lotion Pump |
Sample |
Free |
|
Material |
PP-pump, PE-tube, Aluminium /wood closure |
OEM service |
Yes |
|
Neck size |
18/410 18/415 20/410 20/415 24/410 24/415 28/410 28/415 |
Application |
Shower Gel ,Facial Cleaning Lotion,Body Wash,Detergent,Shampoo, etc |
|
Closure Optional |
Ribbed,Smooth,Shiny/Matte Gold/Silver collar available,Double-deck |
Dosage |
2cc 4cc |
|
Color |
Customized |
Tube length |
Optional (Dip Tube Length According To The Bottle High) |
|
MOQ |
5000 pcs |
Packaging |
47*38*26cm 1000pcs/CTN |
|
Delivery port |
Shanghai or Ningbo port |
Lead time |
7-15days |
