Price | Negotiable |
MOQ | Negotiable |
Delivery Time | 5-15work days |
Brand | Pangolin |
Place of Origin | Hebei China |
Packaging Details | According to customer needs |
Payment Terms | T/T |
Place of Origin | Hebei China | Screen mate | Polyurethane |
Cyclone (mm) | 250 -900 | Packaging Details | According to customer needs |
Total Power | 25Kw -184 Kw | Specification | Can be customized according to requirements |
Tank Volume | 5-30 ㎥ | Brand Name | Pangolin |
Payment Terms | T/T | Impeller material | Cr26 |
Price | Negotiable | Delivery Time | 5-15work days |
Customized | YES | Application | Drilling |
Polyurethane Screen 300GPM Drilling Mud Recycling System
Easy To Disassemble, Saving Time HDD Mud Recycling System
Introduction
1.
Horizontal,
three-cylinder,
single-acting
reciprocating
piston
pump.
The
pump
can
be
powered
by
a
diesel
engine,
which
is
simple
and
convenient
to
operate,
and
can
be
controlled
in
a
short
distance
or
remotely.
2.
This
pump
has
the
characteristics
of
compact
structure,
stable
operation,
high
output
pressure,
long
life,
stable
performance
and
good
versatility.
3.
This
pump
adopts
automobile
transmission,
can
obtain
six
different
displacements
and
pressures,
the
configuration
parameters
are
selected
reasonably,
and
the
construction
technology
can
meet
different
requirements.
4.
Drilling
fluid
is
mainly
used
for
core
drilling
of
coal
geology,
metallurgical
geology,
and
hydrogeology
of
about
2000m.
The
drilling
fluid
can
use
muddy
water,
coal
water,
etc.
Main
structural
features
1.
Good
capacity
and
performance:
The
system
capacity
can
reach
240m3/h
(1000GPM),
which
can
meet
the
slurry
treatment
of
large-scale
trenchless
projects.
2.
The
high
wear-resistant
polyurethane
cyclone
separator
is
the
same
as
the
international
brand,
can
be
used
for
more
than
3800
hours,
has
a
long
service
life
and
good
interchangeability.
3.
All
parts
of
the
equipment
are
connected
quickly
and
disassembled
conveniently,
saving
time.
4.
Explosion-proof
lamps
meet
the
requirements
of
night
construction,
easy
to
operate,
safe
and
reliable.
Product parameters
Customized | YES |
Capacity | 50-240 ㎥/h (200-1000 GPM) |
Screen Area | 2.2-8.4 ㎡ |
Separation Stage | 2stage / 3stage |
Tank Volume | 5-30 ㎥ |
Total Power | 25-184 Kw |
Total Weight | 5.5-20 t |
Land Transport Dimension (mm) | customized |
Screen material | Polyurethane |
Cyclone (mm) | 250 -900 |
Impeller material | Cr26 |
Application | Drilling |
Specification | Can be customized according to requirements |
Model | CSJ-FN-30C | CSJ-FN-60C | CSJ-FN-120C | CSJ-FN-200C | |
Capacity (m3/h) | 30 | 60 | 120 | 200 | |
Slurry pump | Model | DC-EHM-1.5C | DC-EHM-3C | DC-EHM-3C | DC-EHM-4C |
Power (Kw) | 7.5 | 11 | 22 | 37 | |
Pressure (MPa) | 1.0~2.0 | ||||
Shale shaker | Power(Kw) | 1.5 | 2 | 3 | 3 |
Vibration force(KN) | 30 | 40 | 60 | 60 | |
Screen size (mm) |
UP | 1400X600 | 1700x700 | 1900X1000 | 2100x1200 |
Down | 1400X600 | 1700x700 | 1900X1000 | 2100x1200 | |
Cone Model | FN-100 | FN-150 | |||
Cone Number | 3 | 6 | 12 | 8 | |
Separation size (μm) | 10-30 | ||||
Total Power (KW) | 9 | 13 | 25 | 40 | |
System Max.Size(mm) | 1650X1450X2150 | 2000X1600X2250 | 2170X2000X2400 | 2400*2300*2400 | |
System weight (Kg) | 1200 | 1900 | 2500 | 3500 |
HDD
mud
recovery
system
working
procedures
1.
After
1
or
2
or
3
sets
of
desander
cyclones
sit
on
the
vibrating
screen,
a
set
of
centrifugal
pumps
will
separate
the
desander
cyclong
in
the
second
stage,
and
the
solid
desander
will
discharge
the
vibrating
screen
or
directly
cut
the
box
and
the
liquid
flow
desander
Will
flow
into
the
desander
chamber.
2.
After
the
de-sander,
a
certain
number
of
de-sand
cyclones
will
be
placed
to
separate
fine
particles.
The
solids
except
the
de-sand
will
be
discharged
into
the
vibrating
screen
or
cuttings
box,
and
the
fluid
in
the
de-sand
will
enter
the
de-sand
chamber
.
3.
There
is
a
drilling
machine
on
each
side
of
the
drilling
machine
and
a
set
of
vertical
mud
pumps
are
installed
on
the
top
of
the
drilling
machine
to
feed
the
vibrating
screen.
The
shale
shaker
separates
the
drill
cuttings
and
the
fluid
portion
falls
into
the
sand
pool
through
the
sieve
hole.
4.
The
mixing
pump
is
installed
on
the
anti-skid
trough
to
transport
the
drilling
mud
and
inject
the
mud
into
the
mud
hopper
to
remix
the
new
mud
with
new
chemicals.
The
mixing
hopper
can
be
installed
on
the
top
of
the
tank
or
on
the
slider
according
to
customer
requirements.
Pic Show
Pangolin
(China)
Construction
Machinery
Co.,
Ltd.
is
a
drill
manufacturer
with
complete
testing
equipment
and
strong
technical
force.
Our
products
have
a
wide
range,
high
quality,
reasonable
price,
and
timely
delivery,
which
are
widely
used
in
oilfields,
drilling,
non-excavation
fields
and
other
industries.
Our
products
are
widely
recognized
and
trusted
by
users,
and
can
meet
the
ever-changing
economic
and
social
needs.
To
We
welcome
new
and
old
customers
from
all
walks
of
life
to
contact
us
for
future
business
relations
and
mutual
success!
FAQ:
1.
How
to
order
the
products?
A:
Please
send
the
inquiry
with
detail
item
description
or
with
Model
number.
2.
How
about
the
common
packing?
A:
If
there
is
no
special
packing
demand,
we
will
take
it
as
our
normal
packing.
First
in
small
carton,
and
then
put
in
the
bigger
carton
together
to
make
sure
goods
completed.
3.
Can
I
expect
a
quality
products?
A:
Yes.
mature
production
technology
ensuring
the
quality
satisfy
international
request.
4.
How
to
check
the
product
are
the
exact
one
you
want?
A:
If
possible,
please
attach
one
reference
picture
to
avoid
any
misunderstanding
or
any
links
from
our
website
for
a
better
understanding.
5.
How
to
control
quality?
A:
We
have
our
own
experienced
QC
team,there
will
be
strict
inspection
and
testing
for
each
order
before
shipping
out.
6.
Fast
delivery
time:
A:
Usually
it
takes
25
days
for
production.only
3
or
5
days
if
we
have
stock
of
your
request
size.
7.
Competitive
price:
A:
Our
factory
can
supply
you
the
lowest
price
due
to
direct
sale
to
customers
without
distributor!