Price | Negotiable |
MOQ | 1T |
Delivery Time | 10Days |
Brand | Yusen |
Place of Origin | China |
Certification | ISO CE |
Model Number | YS-45/35 |
Packaging Details | Pallet |
Payment Terms | L/C, T/T, Western Union, MoneyGram |
Supply Ability | 2000T/m |
Place of Origin | China | Shape | Deformed |
Packaging Details | Pallet | Material | High carbon steel |
Model Number | YS-45/35 | Supply Ability | 2000T/m |
Feature | Resisting impact | Certification | ISO CE |
Brand Name | Yusen | Payment Terms | L/C, T/T, Western Union, MoneyGram |
Delivery Time | 10Days | Product name | 35mm Steel Wire Loose Hooked Ends Fiber For Concrete Reinforcing |
Length | 35mm | Minimum Order Quantity | 1T |
Applicant | Underground mining | Diameter | 0.75mm |
TS | >1130Mpa |
35mm Steel Wire Loose Hooked Ends Fiber For Concrete Reinforcing
Hooked
Ends
Loose Steel
Fiber
introduction
Hooked
end
steel
fiber
is
manufactured
by
high
quality
wire
rod
with
6.5mm,
this
cold
drawn
steel
wire
has excellent mechanical properties including high tensile strength.
Hence, the average tensile strength of the reinforced fibre surpasses 1000MPa,1200Mpa,1300Mpa,
1500Mpa and even can reach 1800Mpa. Due to this high strength,the uniform distribution of fibers,
stresses
can
be
fully
dispersed
and
cracking
be
effectively
controlled.
Specification
of
Hooked
Ends
Loose
Steel
Fiber
Loose Steel Fiber |
Model | Diameter (mm) | Length (mm) | Aspect ratio (mm) | Tensile strength (MPa) | ||||
YS-50/50 | 1 | 50 | 50 | ≥1000 | |||||
YS-55/50 | 0.9 | 50 | 55 | ≥1000 | |||||
YS-45/35 | 0.75 | 35 | 45 | ≥1000 | |||||
YS-50/30 | 0.6 | 30 | 50 | ≥1100 | |||||
YS-55/30 | 0.55 | 30 | 55 | ≥1100 | |||||
YS-60/30 | 0.5 | 30 | 60 | ≥1100 | |||||
YS-50/25 | 0.5 | 25 | 50 | ≥1100 | |||||
YS-60/25 | 0.4 | 25 | 60 | ≥1100 |
Why choose steel fiber?
To reduce the brittleness and crack in the high-tensile concrete,the steel fiber of different sizes are usually added to the concrete to form steel fiber reinforced concrete structures.As the steel fibers are distributed in the concrete,it can present the crack spread;and resit shock under high tensile stresses.
Projects
1).Blast Furnace Project in Bao Steel
2).Industry Flooring of Hot Rolling Project in Qiangang of Captital Steel Group
3).CSP Project in Wuhan Iron and Steel
4).Metallurgical and Steel Making Project in Xin Yu Iron & Steel Group
5).Industry Flooring of Cold Rolling Project in Meishan Iron and Steel Co.,Ltd
6).Project in Taiyuan Iron and Steel Co.
FQA
1)
How
can
I
pay
you?
A:
T/T
,
Paypal,
Western
Union
are
the
most
usual
ways.
2)How
do
you
take
care
when
your
clients
received
defective
products?
A:
If
there
are
some
defective
items,
it
must
replace
next
order
or
deduct
from
the
amount.
3)How
do
you
check
goods
in
the
production
line?
A:
Test
and
inspect
before
each
step.
4).How long for the transit time?
To South-East Asia,generally 5-20days on sea,Europe takes 30-40day,
US needs10-15day,while South America 30-50days.
Package
and
Delivery
Fair
and
Us