Price | Negotiable |
MOQ | 1T |
Delivery Time | 10Days |
Brand | Yusen |
Place of Origin | China |
Certification | ISO CE |
Model Number | YS-65/50 |
Packaging Details | Pallet |
Payment Terms | L/C, T/T, Western Union, MoneyGram |
Supply Ability | 2000T/m |
Place of Origin | China | Packaging Details | Pallet |
Standard | ASTM | Model Number | YS-65/50 |
Supply Ability | 2000T/m | Certification | ISO CE |
Brand Name | Yusen | Payment Terms | L/C, T/T, Western Union, MoneyGram |
Function | Concrete reinforcement | Packing | 15kgs/bag |
Delivery Time | 10Days | Product name | 65/60 Carbon Concrete Reinforced Hooked Ends Steel Fiber For Industrial Flooring |
Length | 50mm | Minimum Order Quantity | 1T |
Applicant | Road pavement | Diameter | 0.75mm |
TS | 1000Mpa |
65/60 Carbon Concrete Reinforced Hooked Ends Steel Fiber For Industrial Flooring
Hooked
End
Steel
Fiber
introduction
Hooked
end
steel
fiber
is
manufactured
by
high
quality
wire
rod
with
6.5mm,
which
has
excellent
mechanical
properties
including
high
tensile
strength.
Hence,
the
average
tensile
strength
of
the
reinforced
fibre
surpasses
1350MPa.
Due
to
this
high
strength,the
uniform
distribution
of
fibers,
stresses
can
be
fully
dispersed
and
cracking
be
effectively
controlled.
Specification
of
Hooked
End
Steel
Fiber
Hooked
Ends Steel Fiber |
Model | Diameter (mm) | Length (mm) | Aspect ratio (mm) | Tensile strength (MPa) | ||||
YS-60/60 | 1 | 60 | 60 | ≥1000 | |||||
YS-50/50 | 1 | 50 | 50 | ≥1000 | |||||
YS-65/60 | 0.9 | 60 | 65 | ≥1000 | |||||
YS-55/50 | 0.9 | 50 | 55 | ≥1000 | |||||
YS-80/60 | 0.75 | 60 | 80 | ≥1000 | |||||
YS-45/35 | 0.75 | 35 | 45 | ≥1000 | |||||
YS-50/30 | 0.6 | 30 | 50 | ≥1100 | |||||
YS-55/30 | 0.55 | 30 | 55 | ≥1100 | |||||
YS-65/35 | 0.53 | 35 | 65 | ≥1100 | |||||
YS-60/30 | 0.5 | 30 | 60 | ≥1100 | |||||
YS-50/25 | 0.5 | 25 | 50 | ≥1100 | |||||
YS-60/25 | 0.4 | 25 | 60 | ≥1100 |
Application:
Fibers
are
often
used
to
replace
the
nominal
conventional
steel
fabric
in
ground
bearing
slabs.
Steel
fibers
are
increasingly
being
used
in
suspended
ground
floor
slabs
on
piles
to
replace
much,
and
in
many
cases
all,
of
the
reinforcement.
Savings
in
the
cost
of
supplying
and
fixing
the
conventional
welded
fabric
reinforcement
that
is
replaced
can
offset
the
extra
cost
of
adding
fibers
to
the
concrete.
There
may
also
be
health
and
safety
benefits
resulting
from
the
reduced
handling
of
reinforcement.
Also,
problems
caused
by
the
misplacement
of
conventional
steel
in
the
depth
of
the
slab
are
avoided.
FAQ:
1.Are you the factory?
Yes, we are, located in the hometown of wire mesh.
2.How far from Beijing airport?
It takes three hours from our factory to Peking airport,about 300km.
3.Can you accept OEM?
Yes, we can.
4.What is your delivery time?
Generally it needs 10days for 20’ container.
5.What is your minimum order of quantity?
1ton.
6.What is your payment terms.
T/T, L/C at sight, usance letter of credit, Western Union.
Delivery
and
Packing