Price | USD |
MOQ | 1 set |
Delivery Time | 3 month |
Brand | United Win |
Place of Origin | CHINA |
Model Number | SBY-2250x10S |
Packaging Details | Wooden case |
Payment Terms | T/T, L/C |
Supply Ability | 5 sets/month |
Condition | New | Number of warp tape | 2520pc |
Place of Origin | CHINA | Warranty | 1 Year |
Warp/weft core length | 220-230mm | Packaging Details | Wooden case |
Max.roll diameter | Φ1200mm | Dimensions | 18000x4000x4500mm |
Main motor power | 11Kw | Number of shuttles | 10 |
Model Number | SBY-2250x10S | Supply Ability | 5 sets/month |
Weight | 8T | Name | Circular Loom Machine |
Brand Name | United Win | Payment Terms | T/T, L/C |
Price | USD | Delivery Time | 3 month |
Revolutions (Max.) | 70rpm | Weft insertion | 700ppm |
Minimum Order Quantity | 1 set | Warp/weft core inside diameter | Φ32-38mm |
Weft bobbin diameter(max) | 115mm | Working width/double flat | 1700-2250mm |
CE Standard Tarpaulin Making Machine 10 Shuttles Circular Loom Machine Manufacturer
Feature:
1.
Sensitive
automatic
stop
with
the
intelligent
detector
for
warp-breaking,weft-breaking
and
weft-ending
2.
Rimless
wheel
shuttle
style,
less
friction,
more
steady
running;
3.
New
weft
automatic
feeding
system,
reducing
waster;
4.
Adopts
the
latest
energy
saving
synchronous
motors
to
control
the
winder,main
frame
and
fabric
lifting
roller
to
be
synchronized,
when
the
loom
stops,the
winder
stops
at
the
same
time
with
no
harm
of
rubber
sheet
of
winder
roller
and
the
fabric,
also
avoid
less
density
of
fabric
which
is
usually
caused
by
restarting
the
loom
after
stop.
5.
Adopts
the
latest
energy
saving
synchronous
motors
to
adjust
the
weft
density
and
comcensate
the
weft
density
in
case
of
weft-breaking,that
improve
the
evenness
smooth
of
woven
fabric.
Main technical Datas:
ltem | SBY-2250x10S |
Number of shuttles(pcs) | 10 |
Revolutions (Max.) | 70rpm |
Weft insertion | 700ppm |
Working width/double flat | 1700-2250mm |
Number of warp tape | 2520pc |
Warp/weft core inside diameter | Φ32-38mm |
Warp/weft core length | 220-230mm |
Weft bobbin diameter(max) | 115mm |
Main motor power | 11Kw |
Max.roll diameter | Φ1200mm |
Dimensions | 18000x4000x4500mm |
Weight | 8T |
Applictions:
FAQ:
1. How long will your engineer reach our factory?
Within one week after everything ready (machine arrival your factory, non-woven material, power source, air compressor etc. Prepared)
2. How many days will you finish installing?
We will finish installation and training within 15 days.
3. What should we charge for your engineer?
You should charge for the cost of our engineer's air tickets, hotel, food, and also their salary 150USD one day per person.
4. How long is your machine's warranty period?
All our machine has one year guarantee for electricity parts and two years guarantee for mechanism, starting from finished installation.
5. How could you do if the parts broken within warranty?
We would express the free replacement parts during the warranty date
6. How do we solve the machine problem after your engineer leaving?
Generally speaking, there will be no problem after finishing installation. In case you have any problem, you can contact our sales at any time.
Our engineers will take a solution video according your description.