Price | USD |
MOQ | 1 set |
Delivery Time | 3 months |
Brand | unitedwin |
Place of Origin | CHINA |
Model Number | FLP |
Supply Ability | 3 sets/ month |
Dia of container | 700-1500mm | Place of Origin | CHINA |
Warranty | 1 Year | Compressed air Pressure Consumption | 0.6mpa |
Compressed Consumption air | 0.6-1.5m3 /min | Model Number | FLP |
Supply Ability | 3 sets/ month | Name | Granulator Coater |
Brand Name | unitedwin | Power of fan | 5.5-22kw |
Steam Consumption | 35-240kg/h | Price | USD |
Delivery Time | 3 months | Steam Pressure | 0.4-0.6mpa |
Minimum Order Quantity | 1 set | Productive capacity | 2.5-120kg/batch |
Noise(DB) | No more than 75bt separated of fan |
FLP10-120
Series
Fluid-Bed
Granulator
Pelletor
Coater
All
Stainless
Steel
Description:
FLP
Granulator/Coater/Pelleter
is
multi-function
equipment
integrated
spray
drying-granulating-centrifugal
spray
pelletizing-fluid
coating-drying
in
one
body.
The
machine
combines
various
process
operations.
Particularly
it
is
suitable
for
granulating,
pelletizing
and
coating
of
various
varieties
in
pharmaceutical
industry,
foodstuff
industry
and
chemical
industry,
etc.
1.
Multi-function
such
as
granulating,
pelletizing,
coating,
drying
in
one
machine.
2.
Powder
material
granulating.
3.
Powder
material
coating.
4.
Powder
material
pelletizing.
5.
Chinese
medicine
spray
drying,
granulating
and
coating.
6.
Make
10-30
meshes
big
granule.
7.
Film
coating
of
Powder,
granules
and
pellets,
enteric
release,
slow
and
control
release
coating.
8.
Taste
masking,
odor,
moisture-proof,
anti-oxidation,
prevent
water,
heat
insulation,
coloration
and
separation
coating
9.
Powder,
granule,
pellet
agglomerate
material
drying
Specifications:
10 | 15 | 20 | 30 | 45 | 60 | 90 | 120 | ||
Dia of container | mm | 700 | 800 | 900 | 1000 | 1100 | 1200 | 1400 | 1500 |
Productive capacity | kg/batch | 2.5-10 | 3~15 | 5~20 | 7.5-30 | 10-45 | 15-60 | 20-90 | 30-120 |
Power of fan | kw | 5.5 | 7.5 | 7.5 | 7.5 | 11 | 15 | 18.5 | 22 |
Steam Pressure | Mpa | 0.4-0.6Mpa | |||||||
Steam Consumption | kg/h | 35 | 42 | 47 | 60 | 140 | 160 | 180 | 240 |
Compressed air Pressure | Mpa | 0.6Mpa | |||||||
Compressed air Consumption | m3 /min | 0.6 | 0.6 | 0.6 | 0.9 | 0.9 | 1.1 | 1.3 | 1.5 |
Noise | dB | No more than 75dB Separated of fan | |||||||
Installation size for reference | H1(mm) | 2790 | 3350 | 3650 | 3720 | 3720 | 3850 | 3950 | 4190 |
H2(mm) | 340 | 490 | 540 | 590 | 640 | 690 | 740 | 790 | |
H3(mm) | 2570 | 3130 | 3430 | 3500 | 3500 | 3630 | 3720 | 3975 | |
φ(mm) | 250 | 250 | 250 | 280 | 280 | 280 | 280 | 315 | |
L(mm) | 1250 | 1400 | 1450 | 2500 | 1550 | 1600 | 1650 | 1700 | |
B1(mm) | 1160 | 1460 | 1560 | 1600 | 1760 | 1860 | 1960 | 2060 | |
B2(mm) | 1860 | 2460 | 2660 | 2860 | 3060 | 3260 | 3460 | 3660 |
Application:
Company
Information:
FAQ:
1.
How
long
will
your
engineer
reach
our
factory?
Within
one
week
after
everything
ready
(machine
arrival
your
factory,
non-woven
material,
power
source,
air
compressor
etc.
Prepared)
2.
How
many
days
will
you
finish
installing?
We
will
finish
installation
and
training
within
15
days.
3.
What
should
we
charge
for
your
engineer?
You
should
charge
for
the
cost
of
our
engineer's
air
tickets,
hotel,
food,
and
also
their
salary
80USD
one
day
per
person.
4.
How
long
is
your
machine's
warranty
period?
All
our
machine
has
one
year
guarantee
for
electricity
parts
and
two
years
guarantee
for
mechanism,
starting
from
finished
installation.
5.
How
could
you
do
if
the
parts
broken
within
warranty?
We
would
express
the
free
replacement
parts
during
the
warranty
date
6.
How
could
you
do
after
one
year
warranty
period?
We
also
can-do
service
for
you,
but
you
need
pay
salary
for
our
technicians
80USD/day
for
each
person.
7.
Does
your
engineer
understand
English?
Our
engineers
understand
a
little
English.
All
our
engineers
have
more
than
five
years
machine
installation
experience.
8.
Can
you
help
us
find
any
engineer
in
our
location?
Of
course,
we
will
check
and
inform
you
as
soon
as
possible.