Price | USD |
MOQ | 1 set |
Delivery Time | 3 months |
Brand | unitedwin |
Place of Origin | Changzhou,China |
Model Number | UWCL-12/7200 |
Supply Ability | 3 sets/ month |
Place of Origin | Changzhou,China | Warranty | 2 years |
Machine Type | Bag Forming Machine | Material | Plastic |
Model Number | UWCL-12/7200 | Supply Ability | 3 sets/ month |
Shuttle speed | 5~45r/min | Name | Circular loom |
Brand Name | unitedwin | NO. of shuttle | 12/14 shuttles |
Core Components | Motor, Pressure vessel, Pump, PLC, Gear, Bearing, Engine | Price | USD |
Delivery Time | 3 months | MAX width | 3600mm |
Minimum Order Quantity | 1 set | NO. of warp | 3780pcs |
For
Cement
Bag
12
Shuttle
Circular
Loom
Full
Automatic
Woven
Sack
Production
Line
Description:
Heavy-duty
Circular
Loom means
circular
loom
is
capable
of
weaving
the
fabrics
over
400g/m2.
For
high
strength
woven
geo-textile
Chinese
Standard
GB/T17641-1998
lists
the
specification
including
400g/m2
,
460g/m2,
520g/m2,
640g/m2
etc,
these
fabrics
exceeds
the
weaving
ability
of
ordinary
circular
loom,
but
easy
to
be
woven
by
HLW12
due
to
its
heavy-duty
property,
even
800g/m2
can
be
woven.
Why
low
strength
loss
Low
strength
loss
,i.e.
strength
loss
less
than
5%
during
weaving.
1.For
current
circular
loom
,
strength
loss
is
usually
15%
while
weaving
fabrics
80-210g/m2,
20%
for
exceeding
the
this
scope.
Thus
for
same
slit
film,
fabrics
woven
by
circular
loom
of
low
strength
loss
will
gain
10%
higher
in
strength
then
those
woven
by
current
circular
loom.
As
such
to
reach
at
the
same
strength,
circular
loom
of
low
strength
loss
will
save
10%
material
(slit
film)
than
ordinary
circular
loom
does.
2.For
circular
looms
of
low
strength
loss
have
less
scathe
to
slit
film,
compared
with
those
circular
loom
can
only
weave
fabrics
at
55-230g/m2,
they
possesses
wider
weaving
scope
and
more
flexibility,
and
capable
of
weaving
fabrics
at
40-800
g/m2.
3.As
folded
diameter
of
circular
loom
increases,
warps
increase,
too,
meanwhile
the
chances
of
stop
for
slit
film
break
also
increase,
which
lead
to
flaw
and
low
production,
that's
why
current
ordinary
circular
loom
will
be
out
of
run
if
increasing
width
and
warps.
On
the
contrary
warp
break
rate
is
almost
zero
for
circular
looms
of
low
strength
loss,
that's
true
for
even
increasing
up
to
4000,
as
such
circular
loom
with
over-wide
folded
diameter
can
only
be
those
circular
loom
of
low
strength
loss.
Specifications:
No.s | Mould | Shuttle Qty.(pcs) | Max.fold width(mm) | Max. Open width(mm) | Warp no.s(pcs) | Speed(RPM) | Main power(KW) |
1 | UWCL-24/16000 | 24 | 8200 | 16400 | 8000 | 5~25 | 37 |
2 | UWCL-20/11000 | 20 | 5500 | 11000 | 5376 | 5~28 | 22 |
3 | UWCL-16/8300 | 16(12) | 4150 | 8300 | 4800 | 5~41 | 18.5 |
4 | UWCL-12/7800 | 12(14) | 3900 | 7800 | 4400 | 5~41 | 18.5 |
5 | UWCL-12/7200 | 12(14) | 3600 | 7200 | 3780 | 5~45 | 18.5 |
6 | UWCL-12/6500 | 12 | 3260 | 6600 | 3620 | 5~51 | 11/15 |
7 | UWCL-12/6000 | 12(10) | 3050 | 6100 | 3200 | 5~51 | 11/15 |
8 | UWCL-12/5400 | 12(10) | 2700 | 5400 | 2880 | 5~64 | 11/15 |
9 | UWCL-10/4800 | 10(8) | 2400 | 4800 | 2880 | 5~64 | 11 |
10 | UWCL-10/4400 | 10(8) | 2200 | 4400 | 2640 | 5~72 | 7.5/11 |
11 | UWCL-8/3500 | 8 | 1750 | 3500 | 1976 | 5~80 | 7.5 |
12 | UWCL-6/3200 | 6(8) | 1600 | 3200 | 1920 | 5~80 | 7.5 |
13 | UWCL-6/2700 | 6 | 1350 | 2700 | 1512 | 5~100 | 7.5 |
Machine
Details:
1.
How
long
will
your
engineer
reach
our
factory?
Within
one
week
after
everything
ready
(machine
arrival
your
factory,
non-woven
material,
power
source,
air
compressor
etc.
Prepared)
2.
How
many
days
will
you
finish
installing?
We
will
finish
installation
and
training
within
15
days.
3.
What
should
we
charge
for
your
engineer?
You
should
charge
for
the
cost
of
our
engineer's
air
tickets,
hotel,
food,
and
also
their
salary
80USD
one
day
per
person.
4.
How
long
is
your
machine's
warranty
period?
All
our
machine
has
one
year
guarantee
for
electricity
parts
and
two
years
guarantee
for
mechanism,
starting
from
finished
installation.
5.
How
could
you
do
if
the
parts
broken
within
warranty?
We
would
express
the
free
replacement
parts
during
the
warranty
date
6.
How
could
you
do
after
one
year
warranty
period?
We
also
can-do
service
for
you,
but
you
need
pay
salary
for
our
technicians
80USD/day
for
each
person.