Price | $16-$24.5/pcs |
MOQ | 10PCS |
Delivery Time | 5-8 Days |
Brand | Easloc |
Place of Origin | Guangdong, China |
Certification | CE, FCC |
Model Number | DSR727 |
Packaging Details | 1PCS/BOX 10 PCS/ CARTON BOX SIZE: 34*17*10 CM |
Payment Terms | D/A, D/P, T/T, Western Union, MoneyGram |
Supply Ability | 10,000 PCS 1 Month |
Place of Origin | Guangdong, China | Packaging Details | 1PCS/BOX 10 PCS/ CARTON BOX SIZE: 34*17*10 CM |
Product Name | Key Card Door lock | Color | Gold/ Black/ Silver/ Red Bronze |
Material | Aluminium Alloy | Door Thickness | 38-48 mm |
Model Number | DSR727 | Supply Ability | 10,000 PCS 1 Month |
Certification | CE, FCC | MOQ | 10 Pieces |
Product Size | 300*75mm | Brand Name | Easloc |
Payment Terms | D/A, D/P, T/T, Western Union, MoneyGram | Unlock Way | RFID card + Mechanical Key |
Price | $16-$24.5/pcs | Delivery Time | 5-8 Days |
Minimum Order Quantity | 10PCS |
Aluminum Alloy M1 Fare Key Card Door Locks For Home Entry System
Gold Color M1 Fare Key Card Door Locks with 2 Years Warranty
1)
Hotel
card
lock
(
Installed
on
the
hotel
room
door)
2)
PC
(
usually
located
on
the
reception
desk
of
hotel
lobby)
3)
Hotel
management
software
(
Download
to
PC,setting
the
system
)
4)
Encoder
(
Connect
to
PC,Issue
the
cards)
5) Cards ( Open the doors)
Brand Name | Easloc |
Product Number | DSR 727 |
Unlock Method | RFID Card + Mechanical Key |
Card Capacity | 255 Sets |
Read Time | Less Than 3 Seconds |
Battery | 4 Pcs AA Battery |
Mechanical Key | 2 Keys |
Warranty | 2 Years |
Q: Are you a trading company or a manufacturer?
A: we are factory.
Q: What is your minimum order quantity?
A: 1 piece.
Q: Can you test your quality by sampling?
A: After the price is confirmed, you can send a sample to test our quality.
Q: Can you send samples for free?
A: Smart lock does not support free sample delivery for the time being.
Q: When is your delivery date?
A: The delivery time is about 3-5 days after receiving the payment.
Q: What is the delivery time for mass production?
A: Bulk orders have no customization requirements and are usually delivered within 15-20 days.