| Price | USD 0.14-0.5/pack |
| MOQ | 5000 packs |
| Delivery Time | around 30 days |
| Brand | HS |
| Place of Origin | China |
| Certification | ISO 9001 : 2015 |
| Packaging Details | Carton packaging |
| Payment Terms | L/C, T/T, Western Union |
| Supply Ability | 35 tons per month |
| Usage | Halloween Party Decoration | Place of Origin | China |
| Size | 3"*360" ( or customized size) | Packaging Details | Carton packaging |
| Product Name | Yelllow Enter If You Dare Halloween Plastic Fright Tape For Dacoration | Material | White LDPE |
| Supply Ability | 35 tons per month | Certification | ISO 9001 : 2015 |
| Brand Name | HS | Payment Terms | L/C, T/T, Western Union |
| Thickness | 0.025-0.1 mm | Design | OEM/ODM are accepted |
| Payment term | 30% deposit +balance before delivery by T/T | Price | USD 0.14-0.5/pack |
| Delivery Time | around 30 days | Minimum Order Quantity | 5000 packs |
| Packaging | 1 30ft tape+1 paper insert card+ 1 outer polybag | Trade Term | EXW/FOB/CIF price |
|
Item Name: |
Yelllow Enter If You Dare Halloween Plastic Fright Tape For Dacoration |
| Size&Thickness: | Size: 3"*30ft. Thickness usually is 0.04mm. |
| Design Printing: | 2 colors on 1 side/ customized |
| MOQ: | 5000 packs |
| Material: | LDPE |
| Application: | Halloween Party decoration |
| Quality Control: | Advanced Equipment and Experienced QC Team will check material, semi-finished and finished products strictly in every step before shipping |
| Samples: | 1) Free & Nice stock samples offered |
| 2) Customized samples 7-10 working days | |
| 3) Refund Part/Full sample fee after deposit received | |
| Delivery Time: | 30 working days after design confirmed. |
| Shipping Port: | Guangzhou/ Shenzhen |
| Payment Term: | L/C, T/T, Paypal, Western Union accept |
| 30% deposit,and 70% balance before shipment |
Packaging:
1)
72
pcs/carton;
2)
PKG
Size:
Customized
or
Based
on
actual
weight
and
volume.
Shipping:
1) By Express (3-7 working days): suitable for Urgent Time and Small Quantity.
2) By Sea (15-30 days): suitable for regular Mass Production.
3) By Air (4-5 days): from Airport to Airport.