High-Power 250kW PCS 522kWh BESS Container 240kW Solar Energy System for Rapid EV Charging Infrastructure

Price 20000USD~40000USD
MOQ 1
Delivery Time 55-90work days
Brand CTS
Place of Origin Changsha ,hunan province
Certification ISO9001,IATF16949,CE,UN 38.3,MSDS,IEC
Model Number CTS 522kWh/261kWh/241kWh/1044kWh/783kWh
Packaging Details wooden case
Payment Terms T/T,Western Union
Supply Ability 2000pcs/month

Product Details

Product Specification

Place of Origin Changsha ,hunan province Size D*W*H 2438mm(W)*2991mm(D)*2591 mm(H)
Maximum charging current 314A/ 0.5C Packaging Details wooden case
Model Number CTS 522kWh/261kWh/241kWh/1044kWh/783kWh Supply Ability 2000pcs/month
Certification ISO9001,IATF16949,CE,UN 38.3,MSDS,IEC Weight About 10T
voltage 832V capacity 280Ah/230Ah/ 314Ah
Brand Name CTS Payment Terms T/T,Western Union
Energy 241kWh /261kWh/522kWh/783kWh/1044kWh Price 20000USD~40000USD
Delivery Time 55-90work days Minimum Order Quantity 1
name High voltage storage battery 522kWh with 250kW PCS support DC/AC output Rated discharge current 314A/0.5C
Maximum operating voltage range 728V ~ 936V warranty 5 years/ 10years /15years

Product Description

High-Power 250kW PCS 522kWh BESS Container: 240kW Solar Energy System for Rapid EV Charging Infrastructure





Hunan CTS Technology Co,.ltd

Manufacturer, Trading Company
  • Annual Revenue: 10000000-15000000
  • Employees: 100~150
  • Year Established: 2011