| Price | Negotiable |
| MOQ | 1 unit |
| Delivery Time | 7 days |
| Brand | UA |
| Place of Origin | CHINA |
| Certification | ISO9001, SGS, CTI, ROHS |
| Model Number | CUSTOMIZED |
| Packaging Details | Carton Packaging |
| Payment Terms | T/T |
| Supply Ability | 200 Piece/Pieces per Day |
| Life Cycles | >15000 times | Place of Origin | CHINA |
| Size | As per drawings | Packaging Details | Carton Packaging |
| Color | Black | Material | Synthetic stone/ Durostone |
| Model Number | CUSTOMIZED | Supply Ability | 200 Piece/Pieces per Day |
| Certification | ISO9001, SGS, CTI, ROHS | Brand Name | UA |
| Payment Terms | T/T | Thickness | 3-40 mm |
| High Temperature Resistance | 600℃~800℃ | Price | Negotiable |
| Delivery Time | 7 days | Minimum Order Quantity | 1 unit |
| Application | High Temperature, PCB assembly |
PCB Pallet Solder Pallet Synthetic Stone High Temperature Resistant
2. Store the solder pallet fixtures in an upright position. Deformations can be happened if the unit is improperly stored.
To avoid deformations caused by stacking it is recommended that units be stored on shelves.
Drawing & Samples
Packing & Delivery