China Belparts Excavator Solenoid Valve DX140 DX140LC DX215 Electric Parts K1012576 For Doosan for sale
China Belparts Excavator Solenoid Valve DX140 DX140LC DX215 Electric Parts K1012576 For Doosan for sale
  1. China Belparts Excavator Solenoid Valve DX140 DX140LC DX215 Electric Parts K1012576 For Doosan for sale

Belparts Excavator Solenoid Valve DX140 DX140LC DX215 Electric Parts K1012576 For Doosan

Price Negotiable price
MOQ 1 piece
Delivery Time 1-5days
Brand doosan
Place of Origin Made in China
Model Number DX140 DX140LC DX215
Packaging Details Wooden case
Payment Terms T/T, trade assurence, Paypal,Western Union
Supply Ability 1000pcs

Product Details

Product Specification

Place of Origin Made in China Packaging Details Wooden case
Warranty time 1 year Model Number DX140 DX140LC DX215
Supply Ability 1000pcs Brand Name doosan
Payment Terms T/T, trade assurence, Paypal,Western Union Type reducer valve solenoid
part number K1012576 Price Negotiable price
Delivery Time 1-5days Minimum Order Quantity 1 piece
Applicable excavator Model DX140 DX140LC DX215
Delivery 3-7days

Product Description

Belparts Excavator Solenoid Valve DX140 DX140LC DX215 Electric Parts K1012576 for doosan

 

Part Name:solenoid valve
Machine Model:DX140 DX140LC DX215
Part number:K1012576
Warranty:6 months

Part Name solenoid valve
Machine Model DX140 DX140LC DX215
Part number K1012576
Warranty 6 months

 

# Part No Part Name Comment Qty. Price request
- K1012576 VALVE, SOLENOID 8 kg 1
1 *NA00069 BLOCK See page G190-15 1
2 K9001354 SPOOL, SOLENOID   5
2A K9001943 SEAL KIT, SOLENOID 5 kg 1
3 1.519-00001 COIL   5
4 K9002065 VALVE, CHECK   1
4A 1.180-00447 KIT, SEAL 2 kg 1
5 2181-1950D1 PLUG, RECHECK   3
6 S8000111 O-RING 1BP11 3

 

Company introduction

 

Shipping

Customer feedbacks

 

FAQ


Q1. What's your payment methods?
A: Tyte accept payment methods of Paypal, Money Gram, T.T, payment

 

Q2. How long will you delivery my order to me?
A: It normally take 3-5 working days by express. 7-10 working days by air. Longer by sea

 

Q3. How can I trace my order?
A: Once your order is shipped, Tyte will send you the shipping information including tracking no at once

 

Packaging Details:
1.According to orders,pack the spare parts one by one by oil paper;
2.Put them into small carton boxes one by one;
3.Put the packed small carton boxes into bigger carton boxes one by one;
4.Put the bigger carton boxes into wooden boxes if necessary especially for the shipments by sea.
5. Goods is packed by oil paper and plastic bags inside

GUANGZHOU BELPARTS ENGINEERING MACHINERY LIMITED

  • Annual Revenue: 9000000-12000000
  • Employees: 30~100
  • Year Established: 2013